Black Friday Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

 TAE Dumps with Practice Exam Questions Answers

Questions: 40 questions

Last Update: Nov 18, 2024

BCS Certification Exam TAE has been designed to measure your skills in handling the technical tasks mentioned in the certification syllabus

TAE Exam Last Week Results!

20

Customers Passed
BCS TAE

93%

Average Score In Real
Exam At Testing Centre

95%

Questions came word by
word from this dump

An Innovative Pathway to Ensure Success in TAE

DumpsTool Practice Questions provide you with the ultimate pathway to achieve your targeted BCS Exam TAE IT certification. The innovative questions with their interactive and to the point content make your learning of the syllabus far easier than you could ever imagine.

Intensive Individual support and Guidance for TAE

DumpsTool Practice Questions are information-packed and prove to be the best supportive study material for all exam candidates. They have been designed especially keeping in view your actual exam requirements. Hence they prove to be the best individual support and guidance to ace exam in first go!

TAE Downloadable on All Devices and Systems

BCS Test Automation Engineering TAE PDF file of Practice Questions is easily downloadable on all devices and systems. This you can continue your studies as per your convenience and preferred schedule. Where as testing engine can be downloaded and install to any windows based machine.

TAE Exam Success with Money Back Guarantee

DumpsTool Practice Questions ensure your exam success with 100% money back guarantee. There virtually no possibility of losing BCS Test Automation Engineering TAE Exam, if you grasp the information contained in the questions.

24/7 Customer Support

DumpsTool professional guidance is always available to its worthy clients on all issues related to exam and DumpsTool products. Feel free to contact us at your own preferred time. Your queries will be responded with prompt response.

BCS TAE Exam Materials with Affordable Price!

DumpsTool tires its level best to entertain its clients with the most affordable products. They are never a burden on your budget. The prices are far less than the vendor tutorials, online coaching and study material. With their lower price, the advantage of DumpsTool TAE ISTQB Certified Tester Advanced Level-Test Automation Engineering Practice Questions is enormous and unmatched!

BCS TAE Practice Exam FAQs

1. To what extent DumpsTool TAE products are relevant to the Real Exam format?

DumpsTool products focus each and every aspect of the TAE certification exam. You’ll find them absolutely relevant to your needs.

2. To what extent DumpsTool’s products are relevant to the exam format?

DumpsTool’s products are absolutely exam-oriented. They contain TAE study material that is Q&As based and comprises only the information that can be asked in actual exam. The information is abridged and up to the task, devoid of all irrelevant and unnecessary detail. This outstanding content is easy to learn and memorize.

3. What different products DumpsTool offers?

DumpsTool offers a variety of products to its clients to cater to their individual needs. DumpsTool Study Guides, TAE Exam Dumps, Practice Questions answers in pdf and Testing Engine are the products that have been created by the best industry professionals.

4. What is money back guarantee and how is it applicable on my failure?

The money back guarantee is the best proof of our most relevant and rewarding products. DumpsTool’s claim is the 100% success of its clients. If they don’t succeed, they can take back their money.

5. What is DumpsTool’s Testing Engine? How does it benefit the exam takers?

DumpsTool TAE Testing Engine delivers you practice tests that have been made to introduce you to the real exam format. Taking these tests also helps you to revise the syllabus and maximize your success prospects.

6. Does DumpsTool offer discount on its prices?

Yes. DumpsTool’s concentration is to provide you with the state of the art products at affordable prices. Round the year, special packages and discounted prices are also introduced.

TAE Questions and Answers

Question # 1

As a TAE you are evaluating a functional test automation tool that will be for several projects within yourorganization. The projects require that tool to work effectively and efficiently with SUT’s in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.

Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?

  • Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
  • Does the test automation tool support a licensing scheme that allows accessing different sets?
  • Does the testautomation tool have a large feature set, but only part of the features will be sets?
  • Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?

Does the test automation tool need to install specific libraries that could impact the SUT?

A.

A and C

B.

A and E

C.

B and E

D.

C and D

Question # 2

You are currently designing the TAA of a TAS. You have been asked to adopt an approach forautomatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardwareand communication links that can be unreliable.

Which of the following aspects is MOST important when designing the TAA in this scenario?

A.

Looking for tools that allows direct denoting of exceptions and actions depending on the SUT events.

B.

Adopting a test definition strategy based on classification tree coverage for the test definition layer.

C.

Looking for tools that allow performing setup and teardown of the test suites and the SUT.

D.

Adopting a test definition strategy based on use case/exception case coverage for the definition layer.

Question # 3

A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.

Which of the following would be the BEST way to automatically provides this report?

A.

Store the execution results of the integration tests for the last build to adatabase (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.

B.

Store the execution result of the integration testsfor the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team

C.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team

D.

Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Question # 4

Consider a SUT that small run on multiple platform during the execution of automated test runs. In each test run an automated test suite needs to be executed, with the same version of the TAF, against the same version of the SUT of each platform. Each platform shall have its own dedicated test environment. Your goal is to implement a process as automated as possible ( i.e with minimal manual intervention) that allows implementing a consistent setup of the TAS across the multiple test environments.

Which two of the following aspects are MOST relevant for achieving your goal in this scenario?

  • The configuration of the TAS uses automated installation scripts
  • The TAF saves the logs needed to debug errors in XML format

C) Features of the TAF not used by the automated tests have been tested

D) All the automated test cases contain the expected results

E) The TAS components are under configuration management

A.

A and e

B.

B and c

C.

B and d

D.

A and d

Question # 5

Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

Which of the following would you expect to be the MOST specific risk associated with this scenario?

A.

The connectivity from the TAS to the dedicatedtest interfaces will not work

B.

The process of configuring the TAS will be error-phone due to manual intervention

C.

The automated test cases will not contain the expected result

D.

False alarms, that are unlikely to occur in the real world, will be observed during testing