How can you define external task in your project.

Note : there are 2 correct answers for this question.

A.

Assign a purchase order for external processing to the project definition.

B.

Create an external activity in a network.

C.

Create a service milestone.

D.

Create a service activity in a network.

Full Access
Question # 7

You plan an activity that starts on February 1 and finishes on February 28. For this activity, you want to define a milestone for February 10 which should NOT be changed through scheduling. What do you recommend for milestone definition?

A.

Enter an offset of -18 days to the finish date of the activity

B.

Enter February 10 as fixed date

C.

Enter 10 days as duration

D.

Enter an offset of 10 days to the start date of the activity

Full Access
Question # 8

COST AND BUDGET

You have assigned a budget to WBS element with your project

What budget function could be used to check assigned values against the current budget?

A.

Easy cost planning

B.

Results analysis

C.

Cost forecast

D.

Availability control

Full Access
Question # 9

Which object is relevant in assembly processing to create an assembly order for the SD document?

A.

Project profile

B.

Item category

C.

Requirement class

D.

Control key

Full Access
Question # 10

What could be a reason to use expert mode in the valuation method for results analysis?

A.

Billing WBS elements belonging to different company codes

B.

Assignments of different accounts for postings to financial accounting

C.

Usage of different line ID

D.

Valuation in different currencies

Full Access
Question # 11

You have assigned a material to a network activity and want to determine the requirement date related to this activity. What set of dates do you have to maintain?

A.

Actual dates of the network activity

B.

Basic dates of the WBS

C.

Forecast dates of the WBS

D.

Basic dates of the network activity

Full Access
Question # 12

You want to use subnetworks during the project. Which of the following statements describes subnetworks?

A.

Maintenance orders can be defined as sub-network

B.

The scheduling type of a subnetwork is always copied from the superior network

C.

A subnetwork cannot be defined for a superior subnetwork.

D.

Subnetworks must be scheduled separately from the superior network

Full Access
Question # 13

Dates

How are earliest dates and latest dates of activities schedule?

A.

Earliest dates are scheduled by backward scheduling, and the latest dates by forward scheduling.

B.

Earliest dates are scheduled by forward scheduling , and the latest dates by backward scheduling.

C.

Earliest dates and latest dates are scheduled by forward scheduling.

D.

Earliest dates are scheduled by backward scheduling, and the lates dates by copying the earliest dates.

Full Access
Question # 14

Which of the following actions can transfer actual costs for external processing? Note: There are 2 correct answers to this question

A.

Saving a supplier invoice

B.

Saving a service entry shee

C.

Saving a goods receipt

D.

Saving a purchase order

Full Access
Question # 15

Float time is calculated during scheduling.

Which of the following statements about float time are correct?

Note: There are 3 correct answers to this question

A.

Float time can be negative

B.

Activities with the time constraint "Must start on" always have a negative float time

C.

The float time of WBS elements is calculated by extrapolation

D.

By default, critical activities have a float time, which is less than or equal to zero

E.

The maximum size of a free float is as large as the total float of an activity

Full Access
Question # 16

What PPIDS master data is necessary for using PP/DS? Note: There are 2 correct answers to this question

A.

Location

B.

Material

C.

Production version

D.

Resource