New Year Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

C_MDG_1909 Questions and Answers

Question # 6

What are the advantages of having SAP Master Data Governance deployed as a hub system? Note: There are 2 correct answers to this question.

A.

Increased flexibility for master data lifecycle management

B.

No latency for data replication and no cross-system monitoring

C.

No system integration required

D.

Higher flexibility with mapping

Full Access
Question # 7

How do you ensure an attribute is mandatory when an entity is governed? Note: There are 2 correct answers to this question.

A.

Implement a custom validation (for example via ABAP or BRFplus) on the corresponding field.

B.

Adjust the change request customizing for the corresponding field to mandatory.

C.

Adjust the data model by selecting the Required check box for the corresponding field.

D.

Create a new business activity and select the field as mandatory.

Full Access
Question # 8

You want to determine the next processors of an SAP MasterData Governance (MDG) change request without any ABAPprogramming. What options are available for you to do this? There are 3 correct answers to this question.

A.

Organization management transaction PPOME and the corresponding customizing

B.

A workflow step condition that is defined in the Workflow Builder transaction SWDD

C.

A specific assignment of a single user or a special user (for example, previous processor or requester) in the workflow configuration

D.

The mail configuration, where you can monitor SAP MDG mails using transactions U SOST and SCOT

E.

A direct assignment to a specific role built in PFCG in Business Rule Framework plus

Full Access
Question # 9

You want to enable parallel processing of a single material in more than one change request at a time. Additionally, you need to provide a step-specific user interface. What activities would you perform? Note: There are 3 correct answers to this question

A.

Select the Parallel Change Request (PCR) checkbox in Create Change Request Type and choose MATERIAL as main storage and use type 1 entity.

B.

Configure a flex parallel workflow process for MATERIAL entity and implement U DYNAMIC_AGENT_DETERMINATION BAdI to enable parallel processing.

C.

Select the required entities with storage and use type 4 related to the MATERIAL entity to be used in Scope on Entity Type Level.

D.

Use the rule-based workflow and standard workflow in parallel for the same change request L-' type with MATERIAL as the main entity.

E.

Configure properties of the change request step by providing the step-specific user interface ^ application and configuration ID for the change request type step.

Full Access
Question # 10

In which domain is the rule-based workflow set as default?Choose the correct answer.

A.

Supplier/Customer

B.

Custom Objects

C.

Material

D.

Financials

Full Access
Question # 11

Which actions are necessary to successfully import a file with changes in mass processing? Note: There are 2 correct answers tothis question.

A.

Find duplicates based on business rules.

B.

Ensure there is one worksheet for each table to be updated.

C.

Upload a workbook to update tables and fields.

D.

Monitor the process for each worksheet and the volume of data.

Full Access
Question # 12

What is the correct order of mass processing steps in SAP Master Data Governance consolidation and mass processing? Choose the correct answer.

A.

Scope. Selection. Edit. Matching. Validation. Activation

B.

Scope. Selection. Best Record Calculation. Validation. Activation

C.

Scope. Edit. Matching. Update. Activation

D.

Scope. Selection. Edit. Validation. Activation

Full Access