A supply management department is looking to standardize purchases across the entire organization and leverage spend with fewer suppliers. Which of the following will be MOST useful for determining historical baseline costs?
According to the Law of Agency, a supply manager acting as an agent makes decisions and acts in whose interest(s)?
RST, Inc. has been purchasing custom parts from Supplier X for a number of years. RST wishes to exit from its relationship with Supplier X and switch to another supplier. In this situation, which of the following is the BEST course of action for RST to take?
A supply manager submits requests for additional personnel and equipment, which are approved. However, the organization's training budget is cut, giving less opportunity to train new employees. The supply manager is concerned that this will adversely affect the department's ability to build expertise. Given this situation, which of the following is the MOST effective action for the supply manager to take?
The chief procurement officer (CPO) for a large hospital system is planning to implement a new e-sourcing system. Satellite clinics and specialty centers will be authorized to process small orders through this system, rather than sending requests to the central supply management department, as has been done in the past. Which of the following actions by the CPO will MOST likely support a successful implementation of this system?
A supply manager Is leading a project to implement a change from a common grade material to a newer grade that improves performance and achieves cost savings. The project team includes representatives from engineering, quality, sales, product development, and cost accounting. Two suppliers capable of producing the new material have been identified and proposals have been received. The project is now approaching the final implementation phase. Which of the following should be the NEXT step in the process?
Which of the following is the FIRST step in developing a negotiation plan?
XYZ Inc. is a chemical manufacturing company. XYZ requires high levels of consistency and precision from certain suppliers in their machining work. In order to drive continuous improvement with these suppliers, XYZ should develop KPIs to track performance in which of the following areas?
Which of the following are the BEST factors to consider when assigning suppliers to a supplier segmentation matrix?
During a business downturn, a supply manager for RST, Inc. learns that its key supplier is becoming concerned about the firm's unpaid invoices. In this situation, the BEST course of action for the supply manager to take would be to
Smith is a supply manager for BCD, Inc. While planning for a solicitation involving high-volume parts, Smith learns that one of the potential suppliers has recently hired, as account executive, a close relative of Smith's. The relative owns a large block of shares in the supplier's company. In this situation, which of the following is the BEST course of action for Smith to take?
A small company identifies a market need for a new device. However, the firm is relatively young and does not have much design expertise. In this situation, which of the following would be the BEST option for bringing the new product concept to market?
Which of the following is the BEST course of action to take in order to develop a positive working relationship with a supplier?
An organization is preparing its budget for the next fiscal year. Management challenges the procurement team to reduce MRO purchasing costs. The procurement team has reduced the janitorial services budget by 2.5%, but corporate management wants a 5% reduction. Which of the following is the BEST approach for the team to take in order to meet management's expectation?
A research company develops a tomato that grows in cold weather. The company agrees to sell ten thousand seeds to a broker for $5,000. However, an error is made on the contract which
misstates the price as $4,000. The research company and broker both sign the contract without noticing the error. Some weeks later, the broker discovers the error and refuses to pay more than
$4,000. In this situation, the FIRST course of action for the research company to resolve the dispute is to establish with the broker that
An organization selects a supplier for a complex system implementation that will be conducted in several stages. Prompt initiation of the project is necessary in order to maintain the schedule, but the stakeholders have not yet defined the later milestones and deliverables. Which of the following would be the MOST appropriate course of action for the buying organization to take regarding the statement of work (SOW) for this project?
EFG, Inc. is conducting a sourcing activity to identify a provider of operational software. Both large and small consulting firms are invited to bid. Given that the supplier's financial stability will be
an important element in the selection process, which of the following is the BEST course of action for EFG to take?
Rebates are considered part of which of the following types of cost management?
Development of which of the following would be MOST beneficial for supplier technologies and processes important to the buying organization?
A supply manager negotiates an agreement with a salesperson from the supplier's organization. With regard to signing the agreement, which of the following is MOST correct?
A supply manager conducts a two-step bidding process for production material. A supplier is selected and a contract is signed. During the post-contract debriefing session, another supplier offers a lower price and payment terms that are more advantageous to the buying organization. Should the supply manager accept the supplier's offer?
A supply manager issues a Request for Quotation (RFQ) for software development services. Two suppliers respond to the solicitation, and both suppliers' quotes are well above the target range. In this situation, which of the following is the FIRST course of action the supply manager should take?
A manufacturing company with plants and suppliers in numerous locations wants to cut its travel budget for the next year by 20%. Which of the following is MOST likely to help reduce travel costs?
One of TUV Company's largest suppliers has been performing poorly, and the quality of its services does not meet the needs of a particular stakeholder. Which of the following is the BEST way for TUV's supply manager to evaluate how to establish service level agreements (SLAs) to improve the performance of this supplier?
While preparing for negotiations with a supplier, a supply manager learns that the supplier has fallen short of its sales goals for the year. The supply manager uses this information to focus on attaining below-market pricing, with the expectation that the supplier will be eager to improve its sales figures. However, continued discussions with the supplier yield no progress. Which of the following has the supply manager MOST likely failed to consider?
An exploration firm's supply manager meets with the fleet operations team to plan for the acquisition of vehicles to be used in company operations on a remote Pacific island. As removing the old vehicles from the island has proven to be a significant problem, the team requests the inclusion of a "take-back" requirement in the contract. Which of the following is the BEST way for the supply manager to respond to this request?
FGH, Inc. has purchased components from Supplier A for many years. The supplier's performance has been very good, with reliable deliveries and consistently high quality. As contract renewal approaches, Supplier A informs FGH's supply manager that a significant price increase is anticipated, based primarily on the costs of building a new production facility. The supply manager has been directed to negotiate a new contract with Supplier A only if it agrees to maintain current pricing. Which of the following is the BEST way for the supply manager to prepare for negotiations with Supplier A?
An international company is conducting its annual review of its supply management processes to confirm compliance to corporate legal requirements. An external audit team plans to visit each location. Which of the following is the MOST important activity each supply management professional should perform in order to prepare for the audit?
MNO, Inc. has been one of XYZ Company's most valuable customers for a number of years. During a formal competitive bid event for a new product introduction, MNO becomes a supplier to XYZ. In this situation, which of the following should be of GREATEST concern to these organizations?
A manufacturing company signs a cost-reimbursable contract with a new customer that needs a large volume of its product manufactured in a short period of time. The product is difficult and time consuming to fabricate. The contract provides generous flexibility for cost but has severe consequences if the deadline is missed. To ensure the timely completion of the contract, the manufacturer plans to negotiate with a lower-tier supplier for a critical sub-component.
Given this situation, which of the following negotiation objectives is MOST closely aligned with the interests of the manufacturing firm?
A buying organization requires suppliers to maintain an on-time delivery rate greater than 90%. Based on the data below, which of the following can be concluded regarding the delivery performance of these three suppliers?
Supplier A ScoreSupplier B ScoreSupplier C Score
Total Shipments10002000500
Late Shipments6012551
A supply manager submits a request to fill several new positions, along with a proposal for an increased training budget. The new positions are approved, but training funds are cut rather than
expanded for the coming year. The supply manager believes that training will be essential for supply management's ability to support organizational strategy. Given this situation, which of the
following actions by the supply manager is MOST likely to be effective?
A multinational company is in the market to purchase widgets. The firm's standard payment terms are net 80. While negotiating terms and conditions, a supplier offers to provide a 2% discount on the purchase price of the widgets if they are paid within 35 days. This is an example of which of the following?
A business unit conducts discussions with key management members that Include category overviews, contracting executive summaries, local content spending plans, sourcing timelines, and cost management/value creation. These presentations can BEST be described as which of the following?
A supply manager for an electronics firm has been asked to source packaging for the company's new printed circuit board. The specifications recommend 0.50 mm tolerance, with a projected breakage ratio of 0.50% at a cost of $1.00 each. However, the manager is able to find an alternative source of packaging that is specified at 0.60 mm tolerance, with a projected breakage ratio of 0.75% at $0.80 ea.
If the cost of the new circuit board is $50 per unit, which packaging should the supply manager recommend, and why?
In portfolio analysis, purchases for which the buying organization consolidates spend with a handful of suppliers but still maintains competition are BEST classified as
PQR, Inc. is a large international life insurance company. PQR's vice president of sales asks the firm's supply manager to require that any future procurement contracts contain a provision which obligates the supplier to make PQR's insurance products available to the supplier's employees for optional purchase. In this situation, the supply manager should
A firm enters into a contract with a minority business. The invoice does not match the purchase order, and some incorrect items are shipped. The erroneous items, valued at $5,000, are returned. The replacement items are scheduled to be delivered within 2 days. The total invoice is for $18,000, which is a substantial amount for the business. Preferential payment terms have previously been negotiated from 30 to 14 days from receipt of goods, as cash flow is a significant issue. The situation is summarized as follows:
Purchase Order RaisedGoods Received Invoiced
Timing18 days ago 13 days ago 12 days ago
Amount$18,000 $18,000 $18,000
As it will take one business day to process payment, a decision needs to be made on whether the supplier should receive payment on time. Which of the following courses of action should the supply manager take?
The procurement team for a construction firm is tasked with identifying a new supplier of small construction tools. The tools will be subject to heavy usage, and the firm wants the team to focus not only on costs but also service, to ensure the items can be repaired or replaced quickly. However, the firm does not want to invest in any specialized service, and the tools do not represent a strategic advantage to the firm. Based on this information, which of the following kinds of partnerships should the procurement team pursue with the supplier?
Which of the following is the MOST important benefit of implementing a contract management system?
A supply manager is planning a major sourcing event and wants to increase competition, especially by small and minority-owned businesses. The supply manager strives to maintain fairness with all suppliers. Which of the following is the BEST way to encourage diverse suppliers to participate?
A supply manager identifies an overseas source for parts used by the organization. The supplier's capacity, performance, reputation and sample quality are all acceptable. During final price negotiations, the supplier requests that the contract be based on its local currency. Which of the following is the FIRST course of action the supply manager should take in order to address the possible impact of this request?
A supply manager is leading a negotiation team. This team will negotiate with several finalists supplying complex services. Prior to the negotiations, the supply manager briefs the team on strategies, roles and responsibilities. The team members seem to understand the importance of these factors, but shortly after the negotiations commence, several members begin to make mistakes such as arguing witF each other and failing to pay attention. Which of the following is the BEST course of action for the supply manager to take at this point?
HIJ, Inc. is planning to purchase a generic, well specified item offered by many suppliers. This will be HIJ's first time purchasing an item of this type. The market is highly competitive, and HIJ has identified many pre-qualified suppliers. HIJ needs a standard weekly delivery of two full truckloads of the item to meet a fixed production schedule. In this situation, which of the following is likely to yield the BEST value for HIJ?
Planning and negotiating a contract while considering its impact on a supplier is an example of which of the following?
A firm is developing a solicitation to purchase materials in order to meet the needs of a new product launch. The firm anticipates that some or all of its existing suppliers will respond to the solicitation. Given this situation, which of the following is the BEST requirements gathering approach for the firm?
Which of the following refers to the process of generating information about the types of items sourced and their cumulative dollar value, to use for strategic and operational purchase planning?
A supply manager for UVW, Inc. Is considering the use of lead division buying. Which of the following factors is MOST supportive of such efforts?
A state university is looking to purchase equipment to scan books and manuscripts into a digital format. Several variations of this equipment exist in the marketplace, and the university has not decided which format is best for their needs. There is also a possibility that the cost for additional storage requirements will be shared with the state. Given this situation, which of the following is the FIRST course of action the university should take?
A company is about to conduct an opportunity assessment review of the items it purchases. Which of the following categories should be analyzed FIRST?
A manufacturer develops a new product that will be more efficient and easier to use than previous versions. Prototypes are created, evaluated, and approved, and the company begins large scale
production.
Three months into production, costs rise beyond expectations, due to one of the raw materials not providing the economies of scale predicted by the design team. This results in a net loss at the
recommended price point. Which of the following actions should the design team have taken to prevent this situation?
The procurement officer for a publicly-traded U.S. company completes a 409 filing with the Securities and Exchange Commission (SEC), due to a number of supplier deliveries being missed that impact revenue forecasts. The procurement officer's NEXT step should be to
A supply manager Is planning for negotiations with a sole-source supplier of an essential part. The buying firm is already one of the supplier's top customers, and will need even larger quantities of the part to expand its product line in the near future. The supply manager learns that the supplier may experience some financial risks over the coming year, and that the supplier is anxious to solidify its relationships with major customers to mitigate that risk. Which of the following Is the BEST way for the supply manager to gain a deeper understanding of the supplier's position?
A company's internal ordering system for indirect spend generally works well, though one group of products is often ordered under the wrong commodity codes, making spend history inaccurate. Which of the following will MOST likely improve data accuracy?
A buyer finds an opportunity to reduce costs for a particular service through competitive bidding. The buyer issues a request for quotation (RFQ) to prequalified suppliers. However, the statement of work is incomplete, and not clear enough to get an accurate price for the service. Which of the following is the BEST course of action for the buyer to take in order to get a proper statement of work included in the RFQ?
Telling a seller during negotiations that "This is our best and final offer" is a(n)
According to the Committee of Sponsoring Organizations of the Treadway Commission (COSO) framework, which of the following Is an element of effective internal controls?
An automobile manufacturer learns that its supplier for brake parts cannot maintain a steady workforce of machinists. In this instance, it is likely that the manufacturer failed to examine which of the following during supplier performance evaluations?
TUV Inc., a small manufacturing firm, hopes to rebuild its customer base and return to profitability after a period of losing market share. Negotiations with a key supplier will be an important factor in this turnaround if target costs and pricing can be worked out.
Given this situation, which of the following would create the MOST challenging constraints In negotiations?
A product is approaching end-of-life, and the firm is considering its various options. While long-term, ongoing conflicts have occurred between the current supplier and the buying organization, there are few other supply options available for this particular component. In this situation, which of the following is the BEST course of action for the firm to take to ensure continued supply?
CDE Inc. is a metal casting manufacturer that uses a supplier performance scorecard to measure key performance indicators (KPIs) across the business. CDE's supply manager wants Supplier Y to improve on a number of the measured KPIs. Which of the following is the BEST approach for the supply manager to take in order to achieve this objective?
During a request for proposal (RFP) debriefing, a supplier provides clarification on some of the answers in the RFP that, had they been included, would have increased the supplier's score. In response to this, which of the following is the BEST course of action for the supply manager to take?
A supply manager for TUV, Inc. receives a call from an internal stakeholder complaining that for the past several months, one of TUV's longtime suppliers has been late with shipments, disrupting production. The Internal stakeholder has left several messages with the supplier, which have all gone unanswered. The supply manager listens to the stakeholder's concerns and states that these recent occurrences are atypical for this supplier. The supply manager offers to set up a call with the internal stakeholder and the supplier to discuss the situation and determine how the parties can move forward.
Which of the following BEST describes the supply manager's role in this situation?
DEF Corporation is a supplier whose products no longer require incoming inspection. Which of the following BEST describes DEF's supplier categorization?
A sourcing manager completes negotiations for new business intelligence software, to be implemented by the company's fraud prevention department. The one-time licensing fee was originally quoted at $2,000,000, along with an 18% annual software maintenance fee. The sourcing manager was able to negotiate the license fee to $1,500,000.
What are the hard dollar savings for the first year?
A supply manager for FGH, Inc. places a purchase order for 10 widgets with a supplier. The supplier ships 10 widgets and invoices for 10 widgets, and the end user receives 10 widgets. However, the procure to pay system shows receipt of 8 widgets. The supplier demands to be paid the full amount. Responsibility for resolving this issue will fall to FGH's
EFG uses specialized components from Supplier A in the manufacture of state-of-the-art testing equipment. Supplier A has been very successful in meeting EFG's stringent quality specifications, which has been critical for EFG.
EFG learns that Supplier A plans to acquire a smaller firm which makes components similar to those under contract with EFG. EFG is concerned that the supplier may transfer its contract to the new subsidiary, leading to compromises in quality. Given this situation, which of the following is the BEST course of action for EFG to take?
A corporation acquires a startup company, with the objective of branching out into a new product line. The firm's procurement team needs to enlarge the supply base in order to meet the new production requirements. Which of the following is the BEST way for the team to ensure suppliers are aligned with organizational goals?
A plumbing supplies company asks its supply manager to develop a category management plan for the coming year.
The supply manager conducts a spend analysis in order to identify and rank the most important categories. Which of the following should the supply manager use?
A buying firm learns that its sole supplier of a critical part is being sued by an employee for negligence. The firm is currently in negotiations with this supplier. To minimize or avoid risk, which of the following is the BEST tactic for the buying firm to utilize in this situation?
A company has a large upcoming project. While the company has a current list of qualified suppliers capable of participating in this project, the chief procurement officer (CPO) wants supply management to conduct site visits with the suppliers under consideration. A senior supply manager is given the assignment of planning and scheduling the visits. Which of the following is the BEST way to begin this project?
A supplier manufactures toys of proprietary design for its customers. Since the company's customers are industry rivals, the supplier has mutual non-disclosure agreements with each of them. One of these customers has developed a new toy and put it out to bid. Before awarding the contract, the customer's procurement team conducts a site visit to the supplier's factory. During the tour, the supplier asks the procurement team to turn off and put away any cell phones that have cameras. Which of the following BEST describes why the supplier made this request?
Which of the following is the PRIMARY reason why companies should consistently update internal purchasing policies?
A firm becomes a publicly-traded company. To ensure compliance with Sarbanes-Oxley, the company must report what types of risks (if any) on the annual report to shareholders?
A firm has over 1000 active suppliers within its database. The company wants to begin the practice of regular business reviews with suppliers. Of the following, the BEST method for conducting reviews is to
A supply manager for an electronics distributor is asked to buy new routers for the company's wireless network. The supply manager is provided with a detailed scope of work and a list of potential bidders. However, the firm is also interested in investigating alternative solutions available on the market. The original equipment was purchased over 5 years ago and the budget is unknown, but it is roughly estimated at $250,000.
Given these circumstances, the MOST appropriate approach for the supply manager would be to issue which of the following?
Which of the following is MOST important to review before employing a low-cost country sourcing (LCCS) strategy in a remote region located in a distant geographical location?
JKL, Inc. solicits bids for the repair of a boiler used in its shoe factory. Supplier A submits a bid of $7000. The next lowest bid is $8,000, and the remaining bids are between $10,000 and $11,000. JKL awards the contract to Supplier A. However, before beginning repairs, Supplier A realizes it made a mistake and underestimated the repair work. Supplier A refuses to do the work, saying it would lose money. If JKL declines to increase the payment and claims that Supplier A breached the contract, the MOST likely result would be which of the following?
Which of the following is the GREATEST benefit of inviting suppliers to visit the buyer's facility?
An organization contracts with a supplier to manage low value items within its warehouse. The supplier is responsible for stocking nuts, bolts, and screws used by the company's maintenance organization. The supplier performs periodic inventory reviews and issues monthly invoices for items consumed. This is an example of which of the following types of alliance?
A software design firm has traditionally done most of its work in-house, including support services and distribution management. The firm is planning a large expansion, and is evaluating how the various departments can support It. The chief executive officer (CEO) recommends concentrating on core competencies to increase the firm's agility and emphasize what differentiates them from competitors. Which of the following is the BEST way supply management can support this recommendation?
DEF Inc. receives several batches of inferior quality products from a supplier. Although all of the samples provided by this supplier met or exceeded specifications, it is learned that the facility used to produce the samples is in a different location than the regular production facility, and that the production environment could affect quality.
DEF could have prevented this situation by doing which of the following?
A supply manager ensures that each stage of the negotiation process is documented, beginning with the preparations for the negotiation. What is the PRIMARY purpose of maintaining such information?
PQR’s supply manager signs a contract with Supplier X for delivery of parts totaling $1,250,000 per year for four years. Accompanying the contract is a copy of the organization’s signing policy, which states that supply managers have authority to execute contracts up to $1,000,000 per year. Supplier X questions the discrepancy, but is told verbally by the supply manager that the policy has changed, and supply managers now have a $1,500,000 per year signing limit for up to five years.
Senior management at PQR discovers the supply manager's misstatement and tries to disavow the contract. This attempt will likely be