A company with 535 users deploys an Aruba solution with more than 1000 Aruba APs, two 7220 Mobility Controllers, and a single Mobility Master (MM) virtual appliance at the campus server farm. The MCs run a HA Fast failover group in dual mode and operate at 50% AP capacity.
If there is an MM or MC failure, the network administrator must ensure that the network is fully manageable and the MC load does not exceed 80%.
What can the network administrator do to meet these requirements?
Refer to the exhibits.
Exhibit 1
Exhibit 2
A network administrator adds a new Mobility Controller (MC) to the production Mobility Master (MM) and deploys APs that start broadcasting the employee SSID in the West wing of the building. Suddenly, the employees report client disconnects. When accessing the MM the network administrator notices that the MC is unreachable, then proceeds to access the MC’s console and obtains the outputs shown in the exhibits.
What should the network administrator do next to solve the current problem?
Refer to the exhibit.
Based on the output shown in the exhibit, which wireless connection phase has just completed?