Question # 6

Which of the following people are required to be listed on the LEED project registration page?

A.

Owner

B.

LEED AP

C.

Primary Architect

D.

Commissioning (Cx) agent

Full Access
Question # 7

Which of the following is a result of a low impact development rainwater management program?

A.

Treatment of and potential reuse of rainfall on site

B.

Incentive that impervious surface types be extensive

C.

Drainage of rainwater into a municipality drainage system

D.

Reduction of potential use of non-potable water in the project building

Full Access
Question # 8

An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

A.

Energy and Atmosphere Prerequisite, Building-Level Energy Metering

B.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices

Full Access
Question # 9

A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

A.

GreenPro, Ecowise, Greenshield

B.

Quality Pro, Ecowise, Greenshield

C.

San Francisco Tier 3, CRI, Green Seal

D.

Green Seal, San Francisco Tier 3, QualityPro

Full Access
Question # 10

A building is installing outdoor light fixtures that will directly emit light into the night sky. What is the minimum lamp lumens of the fixtures that must be partially or fully shielded to achieve a point for Sustainable Sites Credit, Light Pollution Reduction?

A.

550 lumens

B.

650 lumens

C.

1,500 lumens

D.

2,500 lumens

Full Access
Question # 11

What credit rewards customers who change their normal consumption patterns in response to the varying price of

energy over time?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Full Access
Question # 12

In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

A.

2 ft. (0.6 m)

B.

3 ft. (0.9 m)

C.

4 ft. (1.2 m)

D.

5 ft. (1.5 m)

Full Access
Question # 13

What credit or prerequisite requires a plan for a hazardous spill cleanup?

A.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

B.

Materials and Resources Credit, Solid Waste Management - Ongoing

C.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

D.

Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

Full Access
Question # 14

When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

A.

Distribute the total number of surveys across all tenants evenly

B.

Distribute the total number of surveys across all tenants proportionately, according to their populations

C.

Distribute the total number of surveys across all tenants proportionately, according to their gross floor area

D.

Distribute the total number of surveys across all tenants proportionately, according to their regularly occupied Area

Full Access
Question # 15

Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

A.

Requires input of 36 months of data

B.

Requires ISO 14001 compliance

C.

Requires calculation and input of site energy usage

D.

Requires California Title 24 compliance

Full Access
Question # 16

Which of the following are required to comply with Energy and Atmosphere Credit, Existing Building Commissioning- Implementation?

A.

Master list of findings

B.

Measurement of ventilation systems

C.

Five-year plan for equipment modification

D.

Detailed energy use breakdown by system

Full Access
Question # 17

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?

A.

6 ft. (1.8 m)

B.

8 ft. (2.4 m)

C.

10 ft. (3 m)

D.

12 ft. (3.5 m)

Full Access
Question # 18

For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

A.

80 picograms per lumen hour for 90% of lamps

B.

90 picograms per lumen hour for 90% of lamps

C.

70 picograms per lumen hour for all mercury-containing lamps

D.

80 picograms per lumen hour for all mercury-containing lamps

Full Access
Question # 19

According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Full Access
Question # 20

A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection

Guidance, which rating system would be most applicable for this project?

A.

LEED Interior Design and Construction: Retail

B.

LEED Operations and Maintenance: Retail

C.

LEED Building Design and Construction: Data Centers

D.

LEED Interior Design and Construction: Commercial Interiors

Full Access
Question # 21

For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?

A.

Those that represent at least 10% of the total annual consumption of the building minus plug load use

B.

Those that represent at least 15% of the total annual consumption of the building minus plug load use

C.

Those that represent at least 20% of the total annual consumption of the building minus plug load use

D.

Those that represent at least 25% of the total annual consumption of the building minus plug load use

Full Access
Question # 22

When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields

A.

must be included in the calculations

B.

must be excluded from the calculations

C.

may be included in or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

Full Access
Question # 23

A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

A.

Balance the existing HVAC system

B.

Increase fan capacity to maintain air delivery despite the added resistance

C.

Decrease fan capacity to maintain air delivery despite the added resistance

D.

Replace the existing HVAC system with an air handler that can accommodate the filters

Full Access
Question # 24

The measures called out on the following site plan may contribute to the achievement of which LEED credits?

(Click on Exhibit)

Exhibit

A.

Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Light Pollution Reduction

B.

Sustainable Sites Credit, Rainwater Management; Sustainable Sites Credit, Heat Island Reduction

C.

Sustainable Sites Credit, Rainwater Management; Location and Transportation Credit, Alternative

Transportation

D.

Sustainable Sites Credit, Rainwater Management; Indoor Environmental Quality Credit, Integrated Pest

Management

Full Access
Question # 25

To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

A.

That the meter data is remotely accessible

B.

That the meter is capable of storing data for at least 12 months

C.

That the meter(s) can be manually read

D.

That the meter(s) record data at a minimum of 15 minute intervals

Full Access
Question # 26

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Full Access
Question # 27

Which of the following alternative transportation strategies help reduce pollution and land development effects from automobile use?

A.

Use of motorcycles

B.

Use of hybrid vehicles

C.

Compressed workweeks

D.

Use of Liquified Petroleum Gas (LPG) vehicles

Full Access
Question # 28

According to Sustainable Sites Credit, Rainwater Management, what is the maximum time allowed to comply with a failed inspection?

A.

30 days

B.

45 days

C.

60 days

D.

90 days

Full Access
Question # 29

Innovation credits for exemplary performance are awarded for

A.

reaching 100% threshold

B.

demonstrating significant environmental benefits

C.

achieving the next incremental threshold

D.

demonstrating a quantitative improvement in environmental performance

Full Access
Question # 30

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

A.

120 days

B.

495 days

C.

Two years

D.

Three years

Full Access
Question # 31

A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Existing Building Commissioning – Implementation

Full Access
Question # 32

Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

A.

Install VOC sensors

B.

Document all emissions

C.

Use products with low emissions

D.

Comply with ASHRAE 55-2010

Full Access
Question # 33

Which of the following best meets requirements of Sustainable Sites Credit, Site Development - Protect or Restore Habitat?

A.

Leaving 50% of the site undisturbed

B.

Using native or adaptive vegetation on 20% of the site area

C.

Protecting the habitat of an offsite area of land equal in size to the building site area

D.

Building a rainwater detention pond and using the water for irrigation

Full Access
Question # 34

What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

A.

Botulism

B.

Mold growth

C.

Iron poisoning

D.

Legionella outbreak

Full Access
Question # 35

Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?

A.

Refrigerators

B.

Replacement carpet tiles

C.

Janitorial paper purchases

D.

Automated scrubbing machines

Full Access
Question # 36

Which system can significantly reduce or completely eliminate the amount of potable water used for irrigation?

A.

Drip irrigation system

B.

Irrigation metering system

C.

Moisture sensor system

D.

Rainwater collection system

Full Access
Question # 37

Which of the following LEED AP Operations and Maintenance Water Efficiency Credits has exemplary performance?

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Cooling Tower Water Use

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Credit, Outdoor Water Use Reduction

Full Access
Question # 38

In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

A.

12 hours

B.

24 hours

C.

48 hours

D.

72 hours

Full Access
Question # 39

Cooling tower blowdown is necessary because

A.

too much water in the system is inefficient so its water levels must be lowered

B.

a buildup of dissolved solids increases conductivity which decreases efficiency

C.

excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels

D.

cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening

Full Access
Question # 40

Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

A.

The LEED AP

B.

A general contractor

C.

The building engineer

D.

A commissioning (Cx) agent

Full Access
Question # 41

A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?

A.

Provide free coffee and snacks along with the survey

B.

Provide free transit passes for the week before the survey

C.

Pay each survey respondent a cash incentive to encourage them to take public transportation

D.

Email all building occupants asking them to use alternative transportation the week of the LEED survey

Full Access
Question # 42

What is the diversion percentage of ongoing consumables in order to achieve exemplary performance as specified in Materials and Resources Credit, Solid Waste Management - Ongoing?

A.

50%

B.

75%

C.

85%

D.

90%

Full Access
Question # 43

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Full Access
Question # 44

Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)

A.

All of the five parameters summed together

B.

All of the five parameters subtracted from the maximum concentration level

C.

Whichever of the five parameters has the fewest calculated cycles of concentration without exceeding the maximum level for the parameter

D.

Whichever of the five parameters has the greatest calculated cycles of concentration without exceeding the maximum level for the parameter

Full Access
Question # 45

What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?

A.

Five years from the date that Green Business Certification Inc. (GBCI) initially certified the building

B.

12 months from the date that GBCI initially certified the building

C.

Five years from the date that the project was initially registered with GBCI

D12 months from the end date of the last performance period of the initial certification

Full Access
Question # 46

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Full Access
Question # 47

Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water

budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use

Reduction project teams will be able to

A.

earn Water Efficiency Credit, Water Metering

B.

earn Sustainable Sites Credit, Rainwater Management

C.

determine water use in landscape designs

D.

determine water use in outdoor fountains and pools

Full Access
Question # 48

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

A.

Regional Priority credit

B.

Innovation credit

C.

Exemplary Performance for a related credit

D.

Special Circumstances within a related credit

Full Access
Question # 49

Which of the following is required when documenting a LEED Pilot Credit?

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration