Black Friday Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

LEED-AP-ND Questions and Answers

Question # 6

A standardized base map that should be used throughout the submission to illustrate relevant surrounding features forup to 1 mi.(1.6 km) around the project boundary is a

A.

special map.

B.

permit map.

C.

vicinity map

D.

project site map.

Full Access
Question # 7

A project teamchooses to install highly efficient street lights and traffic lights throughout a 21-acre neighborhood project. Which credit could this efficiency help the team earn?

A.

Light Pollution Reduction

B.

Renewable Energy Production

C.

infrastructure Energy Efficiency

D.

Optimize Building Energy Performance

Full Access
Question # 8

Which strategycontributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?

A.

Non-potable water for cooling towers

B.

Dual-flush toilet

C.

Native vegetation

D.

Water submeters

Full Access
Question # 9

Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?

A.

Hire a registered landscape architect to enhance the design of thelandscape

B.

Provide educational case study and signage about the history of the project site

C.

Construct wetlands using nativeplants to improve hydrology, controlstormwater runoff. and provide wildlife habitat

D.

Contact the state historic preservation office of the National Park Service, or local equivalent to determine if the landscape is registered as a historic site

Full Access
Question # 10

A square site with four equally sized neighboring parcels isbeing considered for a LEEDfor Neighborhood Development project.Consider the following: on the north side of the site is forest land; on the east side Is a church located on a parcel that is 100% developed: and on the south side is a schoollocated on a parcel that is 50% developed. Which one of the following uses on the west side would make this an infill site?

A.

A parcel that is 100% farmland

B.

A library on a parcel that is 75% developed

C.

A market on a parcel that is 50% developed

D.

A post office on a parcel that is 25% developed

Full Access
Question # 11

A LEEDV for Neighborhood Development registeredproject is planning on using airconditioning condensate tor flushing toilets in all new buildings. WhatLEED Prerequisite or creditwill this design help achieve?

A.

GIB Credit Rainwater Management

B.

Credit Outdoor Water Use Reduction

C.

GIB Credit Wastewater Management

D.

GIB Credit indoor Water Use Reduction

Full Access
Question # 12

According to the Minimum Program Requirements, a LEED for Neighborhood Development project should contain at least how many habitable buildings?

A.

One Building

B.

Two building

C.

Three buildings

D.

Four buildings

Full Access
Question # 13

To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1: Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?

A.

City council meeting

B.

Open stakeholder meeting

C.

Zoning commission meeting

D.

Recurring citizen advisory meeting

Full Access
Question # 14

Project plans call for60 detached single-family homes. 120attached three-story townhomes,and an apartment budding with 100 dwelling units in five stones.Which choice below satisfies the requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?

A.

Any combination of 56 homes designed forVisitabilityand universal design

B.

Six detached homes designed for universal design. 12 townhomes designed for universal design. 10 apartments designed forVisitability

C.

Zero detached homes designed forVisitability. 12 townhomes designed forVisitability. 10 apartments designed with universal design features

D.

Twelve detached homes designed forVisitability.24 townhomes designed torVisitability. 20 apartments designed with universal design features.

Full Access
Question # 15

Which of thefollowing strategies comply with Neighborhood Pattern and Design Credit,Community Outreach and Involvement?

A.

Host a public hearing to solicit input after preliminary design

B.

Conduct a one day design charrette including property owners, residents, business owners and workers

C.

Establish ongoing communication channel between developer and community during the design and construction process

D.

Invite local businesses, residents and community planners and other stakeholder's to a meeting held at the siteto review the plan after it has been completed

Full Access
Question # 16

A mixed-use development includes a 150.00011'' (13.935 m2) office building. Which energy analysis option can be considered under Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance for this building?

A.

Performance rating method of ENERGY STAR

B.

Performance rating method ANSI/ASHRAE/ESNA Standard 90.1-2010

C.

Prescriptive measures in the Advanced Buildings® Core Performance™® Guide

D.

Prescriptive measures of the ASHRAE Advanced Energy Design Guide for Small to Medium Office Buildings

Full Access
Question # 17

What is the development footprint?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 18

Which of the following is a minimum program requirement of LEED®Neighborhood Development?

A.

Contain one habitable building and be no larger man 1,000 acres (405 Declares)

B.

Contain two habitable buildings and be no larger man 1,000 acres (405 Declares)

C.

Contain one habitable building and be no larger than 1,500 acres (607 5 hectares)

D.

Contain two habitable buildings and be no larger man 1,500 acres (607 5 hectares)

Full Access
Question # 19

To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the project

A.

near diverse uses.

B.

or an adjacent site.

C.

on a previously distributed alto

D.

within a transit-oriented development.

Full Access
Question # 20

The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to

A.

promote the health and well-being of the community members.

B.

promote the communication between the developer and the construction team.

C.

provide an educational opportunity for real estate and urban planning students.

D.

encourage responsiveness to those who live or work in the community.

Full Access
Question # 21

Which of thefollowing would meet the requirements of an infill site?

A.

At least 25% of its Boundary Borders parcels that are each at least 75% previously disturbed

B.

At least 50% of the land area, exclusive of rights-of-way. within a 1/2 mi. (0.8 km) distance from the project boundary Is previously disturbed

C.

At least 75% of its boundary borders parcels that are Individually at least 50% previously disturbed, and aggregate are at least 75% previously disturbed

D.

The site. in combination with bordering parcels, forms an aggregate parcel whose boundary Is 50% bounded by parcels that ore individually at least 75% previously disturbed, and in aggregate are at least 75% previously disturbed

Full Access
Question # 22

Winch of the following are Included in the intent of Neighborhood Pattern and Design Credit. Local Food Production?

A.

Improve nutrition

B.

Decrease use of genetically modified organisms

C.

Support walking and biking

D.

increase the variety of crop types in a region

Full Access
Question # 23

A city is building a mixed neighborhood which is attempting LEED for Neighborhood Development certification

There are two supermarkets, one former’s market, one bank three restaurants, one laundry and one hair salon within a 1/2 mi. (0.8 km) walking distance of its geographic center. How many uses should be counted when attempting Smart Location & Linkage (SLL) prerequisite?

A.

Five

B.

Six

C.

Eight

D.

Nine

Full Access
Question # 24

A seven-story mixed-use project Hasa zoning setback requirement of40 ft. (12 m). street level retail along 75% ofIts block length and an at-grade parking garage entryway along the remaining 25% of the block length. Which ofthe following strategies will improve the project's walkability?

A.

Specify pervious paving

B.

Provide clear ground floor windows

C.

Use Low Impact Development strategies

D.

Locate the project 1/2 mi, (0,8 km) from a bus stop

Full Access
Question # 25

Atleast how many buildings within a LEED for Neighborhood Development project must be certified by a green building rating system?

A.

One building

B.

Two buildings

C.

Three buildings

D.

Four buildings

Full Access
Question # 26

A projectsite Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults. How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?

A.

27 trees

B.

30 trees

C.

38 trees

D.

42 trees

Full Access
Question # 27

What agency is responsible for identifying prime and unique sods in agriculture and older associated industries?

A.

American Farmland Trust or local equivalent

B.

Stale Natural Heritage Program or local equivalent

C.

Natural Resources Conservation Service or local equivalent

D.

Department of Environmental Conservation or local equivalent

Full Access
Question # 28

Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

A.

Wind exposure

B.

Distance from a wetland

C.

Annual precipitation levels

D.

Elevation above the 100-year flood plain

Full Access
Question # 29

The LEED for Neighborhood Development project learn is tabulating the potential number of points. What is the maximum number of points the team can earn through Regional Priority credits?

A.

Two points

B.

Four points

C.

Six points

D.

Eight points

Full Access
Question # 30

The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?

A.

Neighborhood Pattern and Design Credit. Walkable Streets

B.

Green Infrastructure and Buildings Credit. Solar Orientation

C.

Neighborhood Pattern and Design Credit. Mixed-Use Neighborhoods

D.

Green infrastructure and Buildings Credit, optimize Building Energy Performance

Full Access