Special Summer Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

LEED-AP-BD+C Questions and Answers

Question # 6

Location and Transportation Credit, Reduced Parking Footprint calculations must include

A.

motorbike spaces

B.

on-street parking in public rights-of-way

C.

parking within 1/4 mi. (0.40 km) radius of the project boundary

D.

parking outside the project boundary but used by the project

Full Access
Question # 7

What is the first step to earn the Water Efficiency Credit, Cooling Tower Water Use?

A.

Select air-conditioner condensate for cooling

B.

Calculate cycles of concentration

C.

Identify the maximum number of cycles for the cooling tower or evaporative condenser

D.

Engage a water treatment professional to perform a chemical analysis

Full Access
Question # 8

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Full Access
Question # 9

Which of the following assessments is conducted prior to the completion of the schematic design and explores methods to reduce energy use within a proposed building?

A.

Energy audit

B.

Building systems commissioning (Cx)

C.

Simple box energy analysis

D.

Mechanical systems inspection

Full Access
Question # 10

One point can be achieved through Sustainable Sites Credit, Heat Island Reduction by providing:

A.

Preferred parking for green vehicles

B.

A minimum of 75% of parking spaces under cover

C.

Access to public transportation stops

D.

A roof with artificial turf grass

Full Access
Question # 11

Which of the following Building Product Disclosure and Optimization credits under the Materials and Resources category would a project team achieve by using insulation material that is cradle-to-cradle V3 Gold certified?

A.

Material Ingredients, Option 2. Leadership Extraction Practices and Environmental Product Declarations, Option 1. Environmental Product Declarations (EPD)

B.

Material Ingredients, Option 1. Material Ingredient Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

C.

Sourcing of Raw Materials, Option 1. Raw Material Source and Extraction Reporting and Material Ingredients, Option 2. Material Ingredient Optimization

D.

Sourcing of Raw Materials, Option 2. Leadership Extraction Practices and Material Ingredients, Option 2. Material Ingredient Optimization

Full Access
Question # 12

Which of the following activities must be prohibited within a building as a prerequisite to LEED certification?

A.

Burning fossil fuels

B.

Smoking tobacco products

C.

Preparing non-organic foods

D.

Manufacturing toxic chemicals

Full Access
Question # 13

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building's mechanical engineer should commission his own installations and share the results with the project owner

Full Access
Question # 14

A project design team for an elementary school project is attempting to achieve Innovation Credit, Innovation, Option 1. Innovation. Which of the following strategies would qualify?

A.

Pilot Credit from LEED Pilot Credit Library

B.

Exemplary Performance in Energy and Atmosphere Credit, Optimize Energy Performance

C.

Create educational kiosks and posters around the school with picture of building systems' sustainable features

D.

Implement a building as a learning lab curriculum that has been piloted in three other primary schools in the district

Full Access
Question # 15

An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?

A.

Location and Transportation Credit, High-Priority Site

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses

D.

Location and Transportation Credit, LEED for Neighborhood Development Location

Full Access
Question # 16

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an "anticipated" credit

Full Access
Question # 17

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

A.

LEED BD+C: Retail

B.

LEED BD+C: Data Centers

C.

LEED BD+C: Core & Shell Development

D.

LEED BD+C: New Construction & Major Renovation

Full Access
Question # 18

Which of the following products are eligible for a WaterSense label?

A.

Tankless toilets

B.

Waterless urinals

C.

Public lavatory faucets

D.

Private lavatory faucets

Full Access
Question # 19

A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

A.

$75

B.

$150

C.

$750

D.

$1,500

Full Access
Question # 20

Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?

A.

Retail

B.

Schools

C.

Healthcare

D.

Core and Shell

Full Access
Question # 21

Which of the following items must have safe collection, storage, and disposal for Materials and Resources Prerequisite, Storage and Collection of Recyclables?

A.

Food waste

B.

Medical waste

C.

Electronic waste

D.

Landscape waste

Full Access
Question # 22

In the step-by-step guidance for Location and Transportation Credit, Bicycle Facilities, which of the following requirements can define a bicycle network?

A.

One-way streets

B.

Bike share

C.

Slow speed roadways

D.

Traffic lights

Full Access
Question # 23

Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?

A.

Electrical, Mechanical, Plumbing, and Renewable Energy

B.

Electrical, Structural, Mechanical, and Lighting

C.

Electrical, Structural, Audio Visual, and Envelope

D.

Electrical, Plumbing, Telecommunications, and Fire Suppression

Full Access
Question # 24

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Full Access
Question # 25

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

A.

At least 75% of qualifying land areas within ¾ mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within ½ mile (0.80 km) are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site

Full Access
Question # 26

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the most appropriate for use?

A.

Municipally supplied tap water

B.

Ground surface stormwater runoff

C.

Rainwater collected from the building roof

D.

Graywater from the building's hand-washing sinks

Full Access
Question # 27

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

Full Access
Question # 28

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices

Full Access
Question # 29

Which of the following actions should be taken to ensure that project teams understand and prioritize the selection of materials compliant with the Materials and Resources Credit, Building Product Disclosure and Optimization?

A.

Include the material requirements in the project specifications

B.

Select locally sourced and manufactured materials

C.

Include all building materials in a whole-building life-cycle analysis

D.

Procure materials directly from raw material suppliers

Full Access
Question # 30

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

A.

Site Development-Protect or Restore Habita

B.

Site Assessment

C.

Heat Island Reduction

D.

Light Pollution Reduction

Full Access
Question # 31

Which of the following Materials and Resources credits or prerequisites is reviewed under the design phase documentation submission?

A.

PBT Source Reduction - Lead, Cadmium, and Copper

B.

PBT Source Reduction - Mercury

C.

Building Product Disclosure and Optimization - Environmental Product Declarations

D.

Building Product Disclosure and Optimization - Sourcing of Raw Materials

Full Access
Question # 32

Water Efficiency Prerequisite, Outdoor Water Use Reduction, Option 2. Reduced Irrigation, requires that a project's landscape water requirement be reduced by what percentage from the calculated baseline for the project site's peak watering month?

A.

20%

B.

25%

C.

30%

D.

40%

Full Access
Question # 33

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

A.

10%

B.

25%

C.

50%

D.

75%

Full Access
Question # 34

Which of the following credits advocates the values and benefits of green building design and construction as well as outdoor physical activity?

A.

Sustainable Sites Credit, Light Pollution Reduction

B.

Sustainable Sites Credit, Open Space

C.

Environmental Quality Credit, Quality Views

D.

Location and Transportation Credit, Reduced Parking Footprint

Full Access
Question # 35

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

A.

HVAC air system for air conditioning

B.

Electrical lighting system during peak use hours

C.

Water flow system used for public faucets and toilets

D.

Condenser water system with a cooling tower and condenser water pumps

Full Access
Question # 36

Which of the following is omitted from the assessment while performing preliminary energy modeling?

A.

Massing and orientation

B.

Thermal comfort ranges

C.

Supply sources

D.

Plug and process loads

Full Access
Question # 37

Which of the following prerequisites or credits are affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit. Thermal Comfort?

A.

Energy and Atmosphere Credit. Demand Response

B.

Energy and Atmosphere Credit. Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite. Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite. Building Level Energy Metering

Full Access
Question # 38

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

A.

Coordinate open space features during the construction phase

B.

Minimize the floor-area ratio (FAR) and accessibility for open space

C.

Design a parking and road footprint layout that is not near open land

D.

Coordinate open space features early during the site planning phase

Full Access
Question # 39

Which of the following would be classified as a public use faucet?

A.

Patient room sink

B.

Hotel sink

C.

Dorm room sink

D.

School classroom sink

Full Access
Question # 40

A comprehensive rainwater management plan may include design elements such as

A.

artificial turf, bioretention pond, cisterns and hay bales

B.

cisterns, porous pavement, swales and vegetated roofs

C.

soil compaction, swales, vegetated roofs and xeriscaping

D.

bioretention pond, cisterns, porous pavement and stabilized construction entrance

Full Access
Question # 41

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Full Access
Question # 42

Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?

A.

The square-footage-of-usable-space method

B.

The space-by-space method

C.

Glare rating index method

D.

Seasonal usage peaks method

Full Access
Question # 43

A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED

AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

A.

Airport flyover maps, mechanical plans, wall sections

B.

Patient records, wall sections, ceiling panel cut sheets

C.

Occupancy statistics, patient records, MRI machine specifications

D.

MRI machine specifications, mechanical plans, occupancy statistics

Full Access
Question # 44

The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

A.

Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities

B.

Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space

D.

Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Full Access
Question # 45

Which of the following will result in a higher demand for potable water use in irrigation?

A.

Sparsely planted area

B.

Drip irrigation system

C.

High evapotranspiration rate

D.

Rainwater harvesting system

Full Access
Question # 46

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

A.

Local building code

B.

ASHRAE 62.1-2010

C.

International Mechanical Code 2012

D.

The ventilation code requiring the greatest volume of outside air

Full Access
Question # 47

When using the Integrative Process, what is the best way for the LEED AP to assess the impact of indoor and outdoor water consumption in a Building Design and Construction project?

A.

Perform a preliminary water budget analysis before the completion of schematic design

B.

Install permanent metering on both the water sources and the waste water leaving the site

C.

At the completion of schematic design, count the fixtures and apply the maximum flow rate

D.

Estimate consumption by using 20 gal. per day (76 I per day) for each Full Time Equivalent (FTE) scheduled to occupy the building

Full Access
Question # 48

What percentage of a building's surface area may be excluded from the calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 2. Renovation of Abandoned or Blighted Buildings because of deterioration or damage when maintaining existing building structure, enclosure and interior structural elements?

A.

5%

B.

10%

C.

25%

D.

50%

Full Access
Question # 49

For a bicycle network to demonstrate compliance with Location and Transportation Credit, Bicycle Facilities, the bicycle network must connect to

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a post office and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Full Access
Question # 50

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

A.

Entirely outside any floodplain subject to a 1% or greater chance of flooding in any given year

B.

Within a floodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a 2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a 3% or greater chance of flooding in any given 10-year period

Full Access
Question # 51

A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

A.

natural gas

B.

hot water at the main service point

C.

nothing, because the flat fee is included as part of the lease

D.

nothing, because the energy source is outside of the project's scope

Full Access
Question # 52

What building classification requires the energy model to determine the predicted power usage effectiveness (PUE) for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Office

B.

Hospital

C.

Warehouse

D.

Data Center

Full Access
Question # 53

The gross floor area of a LEED project should be no less than what percent of the gross land area within the LEED project boundary?

A.

3%

B.

1%

C.

2%

D.

4%

Full Access
Question # 54

A downtown office building is unable to construct dedicated parking for its occupants. However, the building developer has partnered with a parking garage to offer discounted parking for its occupants. If the discounted parking rate is $450 per month, how much must the rate be for green vehicles for the building to receive one point for Location and Transportation Credit, Green Vehicles?

A.

$90

B.

$225

C.

$360

D.

$405

Full Access
Question # 55

Innovation credits for exemplary performance can be awarded for

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Full Access
Question # 56

What role does the LEED AP have when creating the Owner's Project Requirements (OPR) document?

A.

Oversees the design team writing the OPR

B.

Authors the OPR with the design team

C.

Publishes the completed OPR

D.

Helps the owner develop the OPR

Full Access
Question # 57

A request to change the lighting fixtures in a conference room is made by a tenant. Which of the following credit scorecard changes will be directly and indirectly impacted by the change in lighting fixtures?

A.

Indoor Environmental Quality Credit, Interior Lighting and Sustainable Sites Credit, Light Pollution Reduction

B.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Advanced Energy Metering and Indoor Environmental Quality Credit, Daylight

D.

Indoor Environmental Quality Credit, Thermal Comfort and Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

Full Access
Question # 58

Which of the following contributes to the value of the commissioning process?

A.

Ensuring that the project budgetary goal is met

B.

Verifying that the building systems perform as intended

C.

Verifying that the building water fixtures are installed properly

D.

Ensuring that the project is delivered to meet the permitting requirements

Full Access
Question # 59

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

Full Access
Question # 60

Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

A.

A standard garbage disposal

B.

Electronic submeter at the domestic water supply pipe to the building

C.

An open-loop HVAC system that discharges potable cooling water to a nearby lake

D.

Commercial dishwasher that is ENERGY STAR® labeled or performance equivalent

Full Access
Question # 61

What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

A.

Photographs of bicycle network signage and directional signposts

B.

Photographs of the installed bicycle storage and shower facilities

C.

Vicinity map showing bicycle network, route and distance along network to eligible destination(s)

D.

Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Full Access
Question # 62

A consultant specifies the required U-value, solar heat gain coefficient, and visible light transmittance for a project. What type of building envelope assembly would require these attributes?

A.

Floors

B.

Roofs

C.

Walls

D.

Windows

Full Access
Question # 63

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

A.

Building Design and Construction: Schools

B.

Building Design and Construction: Healthcare

C.

Building Design and Construction: Hospitality

D.

Building Design and Construction: Data Centers

Full Access
Question # 64

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

A.

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Full Access
Question # 65

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using a Solar Photovoltaic System?

A.

Carbon offsets

B.

Daylighting strategies

C.

Passive solar strategies

D.

Produced electricity consumed on-site

Full Access
Question # 66

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

A.

Taxi stand

B.

Ferry terminal

C.

Local bus stop

D.

Streetcar stop

Full Access
Question # 67

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Alternate Daily Cover

Full Access
Question # 68

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Full Access
Question # 69

Green Infrastructure (GI) and Low-Impact Development (LID) rainwater management strategies improve upon the conventional approach for rainwater management by

A.

replicating a site's natural hydrology

B.

discharging rainwater at a faster rate

C.

increasing a site's impervious surface

D.

providing a greater volume of rainwater detention

Full Access
Question # 70

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

A.

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Full Access
Question # 71

A new school with a 20 car parking lot has set aside four preferred parking spaces for green vehicles. What else must the project team provide to achieve Location and Transportation Credit, Green Vehicles?

A.

Nothing; the project team has met the credit requirements

B.

Provide secure bike racks for 5% of the building occupants

C.

Provide an additional parking space for a low-emitting and fuel-efficient vehicle

D.

Provide qualifying electrical vehicle supply equipment in 2% of all parking spaces

Full Access
Question # 72

When required to measure residential and non-residential densities, Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to measure the residential and non-residential densities in what way?

A.

Measure densities within a ¼ mile (0.40 km) radius of the project boundary

B.

Measure densities within a ¾ mile (1.20 km) radius of the project boundary

C.

Measure densities within a ⅓ mile (0.53 km) radius of the project boundary

D.

Measure densities within a ½ mile (0.80 km) radius of the project boundary

Full Access
Question # 73

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Full Access
Question # 74

Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System's manual

D.

Integrated Project Delivery report

Full Access
Question # 75

A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction. New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

A.

Historic Building Reuse

B.

Building and Material Reuse

C.

Whole-Building Life-Cycle Assessment

D.

Renovation of Abandoned or Blighted Building

Full Access
Question # 76

Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

A.

A targeted Brownfield remedy plan

B.

Historic preservation plan to include neighboring properties

C.

Proximity of vulnerable populations to major sources of air pollution

D.

The surrounding density within a 1/4 mi. (0.40 km) radius of the project boundary

Full Access
Question # 77

What is the reference standard that defines the requirements for LEED energy modeling?

A.

ASHRAE 62.1-2010

B.

Core Performance Guide

C.

ASHRAE Advanced Energy Design Guide

D.

ASHRAE 90.1-2010 Appendix G

Full Access
Question # 78

Which of the following criteria must a Commissioning Authority (CxA) comply with in order to meet the requirements of the Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification of Building Energy Systems?

A.

Document commissioning authority experience for at least one building project

B.

Review the owner's project requirements (OPR) for project goals and expectations

C.

Be a part of the project's design and construction management team

D.

Report results, findings, and recommendations directly to the architect

Full Access
Question # 79

How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

A.

$150.00

B.

$50.00

C.

$100.00

D.

$125.00

Full Access
Question # 80

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

A.

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

Full Access
Question # 81

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Full Access
Question # 82

What is the basis of energy consumption in determining the percentage of green power or carbon offsets?

A.

Quality

B.

Quantity

C.

Efficiency

D.

Performance

Full Access
Question # 83

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused

Full Access
Question # 84

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Full Access
Question # 85

An accessible garden planted with native plants contributes to the achievement of which of the following credit pairs?

A.

Sustainable Sites Credit, Sensitive Land Protection; Sustainable Sites Credit, Site Development - Protect or Restore Habitat

B.

Sustainable Sites Credit, Open Space; Sustainable Sites Credit, Rainwater Management

C.

Water Efficiency Credit, Water Metering; Sustainable Sites Credit, Tenant Design and Construction Guidelines

D.

Location and Transportation Credit, Surrounding Density and Diverse Uses; Sustainable Sites Credit, Site Assessment

Full Access
Question # 86

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

Full Access
Question # 87

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

A.

Must include the athletic field and playground

B.

May include the playground but must exclude the athletic field

C.

Must include the playground but exclude the athletic field

D.

May include or exclude the athletic field and the playground

Full Access
Question # 88

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Full Access
Question # 89

The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document should be used to record the project goals to be used throughout the design of the project?

A.

Owner's Project Requirements (OPR)

B.

Owner's list of wants and needs

C.

Criteria for contractor selection

D.

Basis of Design (BOD)

Full Access
Question # 90

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Full Access
Question # 91

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:

A.

All luminaires have full cutoff fixtures

B.

All luminaires are mounted at least three mounting heights from the lighting boundary

C.

All luminaires have a minimum color temperature of 3500 K

D.

All luminaires meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

Full Access
Question # 92

The energy-related systems analysis for Integrative Process credit for Core and Shell projects should include all system loads and occupants required by which Energy and Atmosphere prerequisite?

A.

Building-level energy metering

B.

Fundamental commissioning and verification

C.

Minimum energy performance

D.

Fundamental refrigerant management

Full Access
Question # 93

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Full Access
Question # 94

When the project occupancy is not known, which method is recommended?

A.

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns

Full Access
Question # 95

A new building containing private offices is pursuing Location and Transportation Credit, Access to Quality Transit. Which would comply?

A.

Locate the project ¼ mile (0.4 km) walking distance from two campus bus system lines (only accessible to campus students) with two stops each

B.

Locate the project ½ mile (0.8 km) walking distance from two bus lines with two stops each

C.

Locate the project ¼ mile (0.4 km) walking distance from a planned, funded, and partially complete subway station

D.

Locate the project ½ mile (0.8 km) walking distance from a planned, not funded commuter rail

Full Access
Question # 96

A building owner installs a building automation system (BAS) to allow programmable load control. Which of the

following credits can be pursued because of the installation?

A.

Energy and Atmosphere Credit, Demand Response

B Energy and Atmosphere Credit, Ongoing Commissioning

B.

Energy and Atmosphere Credit, Enhanced Commissioning

C.

Energy and Atmosphere Credit, Enhanced Refrigerant Management

Full Access
Question # 97

While working on a 12,000 ft² (1,114.8 m²) medical building, a LEED AP asks the flooring manufacturer to submit the Environmental Product Declaration (EPD) for the flooring specified. The manufacturer doesn't have an EPD for their products, but all products meet ISO 14040/44 for Life Cycle Assessment (LCA). They ask if it would be acceptable to send the ISO 14040/44 LCA information in lieu of an EPD. How do you respond?

A.

Contact another manufacturer that has a comparable product with an EPD

B.

Exclude the flooring from the LEED credit as non-compliant

C.

Request recycled content information, as the ISO 14040/44 LCA is not sufficient for compliance

D.

Use the ISO 14040/44 LCA information just like an EPD to complete the documentation for the LEED credit

Full Access
Question # 98

In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2, Additional Enhanced Air Quality Strategies:

A.

All entrances to the building must have entryway systems 10 ft. (3 m) long in the direction of travel

B.

All particle filters in the ventilation system must meet Comité Européen de Normalisation (CEN) standard Class F7 or better

C.

CO₂ monitors must be fitted in all densely occupied spaces and configured to provide an alert

D.

All outdoor air supply systems must have an airflow measurement device that measures at least 90% of the airflow

Full Access
Question # 99

Sustainable Sites Credit, Site Assessment requires evaluation of

A.

soils, archeology, hydrology

B.

topography, hydrology, human use

C.

vegetation, topography, archaeology

D.

human health effects, climate, land value

Full Access
Question # 100

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Full Access
Question # 101

During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

A.

Energy meter location

B.

Equipment Maintenance Plan

C.

Owner's Project Requirements

D.

Coordination of other contractors

Full Access