Question # 6

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

A.

Software update

B.

Conversion

C.

Main import

D.

Migration

Full Access
Question # 7

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

A.

PARMVNT_UPG

B.

TABIMJJPG

C.

PARDIST_SHD

D.

TABIM_SHADOW_*

Full Access
Question # 8

What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

A.

The benchmaking option allows you to migration a specified set of tables

B.

The benchmaking option allows you to repeat the uptime migration

C.

The repetition option allows you to run the migration without a shadow system

D.

The repetition option allows you to repeat the complete migration

Full Access
Question # 9

You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".

Where can you change this during the migration via the Utilities option of the SUM UI?

There are 2 correct answers to this question

Response:

A.

In SUM Phaselist

B.

In Process Control Center

C.

In SUM Parameters

D.

In DMO Migration Preparation

Full Access
Question # 10

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?

There are 2 correct answers to this question.

A.

Kernel for target release, Windows, SAP MaxDB

B.

Kernel for target release, Linux, SAP HANA

C.

Kernel for target release, Windows, SAP HANA

D.

Kernel for source release, Windows, SAP MaxDB

Full Access
Question # 11

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

A.

An additional temporary database is used during uptime

B.

Dedicated application tables are migrated in uptime

C.

TABIMJJPG is executed in uptime

D.

The repository is migrated in uptime

Full Access
Question # 12

During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?

There are 2 correct answers to this question.

Response:

A.

Check for running batch jobs in the shadow system via Job Overview (SM37)

B.

Check for running R3trans processes on the host of the primary application server

C.

Check for running R31oad processes on the host of the primary application server

D.

Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Full Access
Question # 13

You are planning an SAP S/4HANA conversion.

Which conversion-specific tasks must be performed during the preparation phase?

A.

Check the compatibility of custom code with SAP S/4HANA.

B.

Run the database migration to the SAP HANA database.

C.

Solve problems from the simplification item (SI) checks.

D.

Perform the migration of data to the new data structure.

Full Access
Question # 14

In ICNV. How database operations synchronized between the source and the target table?

A.

Deletes are directly executed in the target table by delete trigger.

B.

AA

Full Access
Question # 15

You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?

Please choose the correct answer.

Response:

A.

Before the downtime starts

B.

At the end of the downtime

C.

As part of the cleanup process

D.

Early in the downtime

Full Access
Question # 16

You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

A.

AA

B.

As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.

Full Access
Question # 17

You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.

Following SAP recommendations, how will you achieve this?

There are 2 correct answers to this question.

Response:

A.

Specify the business functions that need to be switched on during the prepare part of SUM.

B.

Import a transport request from the development system that contains the recording of the activation.

C.

Activate the required business functions manually in the production system.

D.

During conversion, SUM delivers some business functions already activated.

Full Access
Question # 18

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Full Access
Question # 19

You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?

There are 2 correct answers to this question.

Response:

A.

SYCM (Simplification Database Content)

B.

SAT (Runtime Analysis)

C.

ATC (ABAP Test Cockpit)

D.

SE80 (Object Navigator)

Full Access
Question # 20

What is the benefit of using the file UPGANA.XML from a previous SUM run?

Please choose the correct answer.

Response:

A.

To auto-fill specific fields on selected screens on the SUM UI

B.

To make the progress information within SUM UI more accurate

C.

To repeat specific phases during the SUM run

D.

To skip selected phases during the SUM run

Full Access
Question # 21

You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

A.

The source system is non-Unicode and the target database is a scale-out system.

B.

The target database size increases temporarily because of the Shadow Repository.

C.

SAP HANA Landscape Reorganization required a manual step to edit a file.

D.

Network capacity between exporting and importing R3load processes must be.

E.

Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Full Access
Question # 22

You are running an SAP ECC system.

For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?

Note There are 3 correct answers to this question

A.

Upgrade the SAP system

B.

Perform an SAP S/4 HANA conversion without DMO

C.

Perform an SAP S/4 HANA conversion including DMO

D.

Apply SAP support packages

E.

Use DMO for SUM

Full Access
Question # 23

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool