C_TS422_2023 Questions and Answers

Question # 6

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

A.

By capacity planning

B.

By order confirmation

C.

By order release

D.

By mass processing

Full Access
Question # 7

What can you use standard heuristics in Advanced Planning (PP/DS) for?

A.

To automate material movements in material staging

B.

To set default values in production master data

C.

To solve planning problems for defined objects

D.

To optimize costs and times in production plans

Full Access
Question # 8

What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Change the assignments of production quantities to production lines.

B.

Create new production quantities.

C.

Dispatch operations to work centers.

D.

Reschedule and deallocate operations.

Full Access
Question # 9

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

A.

Post the goods receipt for the finished product.

B.

Reduce run schedule quantities.

C.

Post production costs to the planned order.

D.

Update statistics for the Business Information Warehouse.

E.

Create associated capacity requirements.

Full Access
Question # 10

What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.

A.

Reduced delivery times

B.

Reduced times for final assembly

C.

Option to forecast planning for production resources

D.

Option to use make-to-order production

Full Access
Question # 11

What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Activating the reporting point backflush in the order-dependent parameters

B.

Activating the reporting point backflush in the work centers

C.

Defining the relevant work centers in the routing

D.

Defining the operations as reporting points using the control key

Full Access
Question # 12

What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.

A.

Scheduling of an operation takes place as close as possible to the desired date.

B.

Sequencing on multi-activity resources is automatically updated.

C.

Neighboring operations can be moved in both directions in order to create a slot.

D.

Changes are automatically implemented in the complete collective order.

Full Access
Question # 13

Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

A.

Order (pool) chart

B.

Capacity requirements chart

C.

Orders (dispatched) chart

D.

Work center capacities chart

Full Access
Question # 14

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

Full Access
Question # 15

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing and bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing and bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

Full Access
Question # 16

Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

A.

Assign the alert profile to the overall profile.

B.

Assign the overall profile to the authorization profile.

C.

Create an object selection variant for alerts according to the priority of ATP categories.

D.

Create an object selection variant for production-planning-related alerts.

Full Access
Question # 17

What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

A.

Order type

B.

Requirements profile

C.

Requirements type

D.

Planning strategy

Full Access
Question # 18

What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

Manufacturing date

B.

BOM header status

C.

BOM component status

D.

Lot size

Full Access
Question # 19

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

A.

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

B.

Add the agreement to the source list mark it for MRP relevance.

C.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

D.

Add the agreement to the quota arrangement mark it for MRP relevance.

Full Access
Question # 20

How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

A.

Digital signature

B.

Approved resources

C.

Recipe approval

D.

GMP-compliant flag

E.

Batch record

Full Access
Question # 21

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Production by lot size (30)

D.

Planning at assembly level (70)

Full Access
Question # 22

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling in the past. How can you parameterize this in the strategy profile?

A.

Specify a negative offset time.

B.

Specify a negative opening period.

C.

Specify a negative planning horizon.

D.

Specify a negative PP/DS horizon.

Full Access
Question # 23

What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

A.

The Finite Scheduling indicator is NOT set in the strategy profile.

B.

The work center has several individual capacities.

C.

Alternative work centers are fully occupied.

D.

The Change Planning Direction indicator is set in the strategy profile.

Full Access
Question # 24

Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Production cost collector

B.

Production version

C.

Repetitive manufacturing profile

D.

Routing

Full Access