C_TS422_2023 Questions and Answers

Question # 6

You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Production by lot size (30)

D.

Planning at assembly level (70)

Full Access
Question # 7

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

In which storage location is the BOM required?

B.

Is the material type allowed in the BOM?

C.

Which base unit of measure does the material have?

D.

What status does the BOM have?

Full Access
Question # 8

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?

Note: There are 2 correct answers to this question.

A.

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

B.

Add the agreement to the source list mark it for MRP relevance.

C.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

D.

Add the agreement to the quota arrangement mark it for MRP relevance.

Full Access
Question # 9

You are trying to create a production order NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

A.

The order lot size is NOT within the validity range of a production version.

B.

NO production lines are assigned to the production versions.

C.

All production versions for the material are locked.

D.

NO bills of material (BOMs) are assigned to the production versions.

Full Access
Question # 10

Your project uses process orders for the production of liquid chemicals.

What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

Full Access
Question # 11

What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

A.

MRP creates a dependent requirement.

B.

A sales order is delivered.

C.

MRP creates a planned order.

D.

A sales order is created.

Full Access
Question # 12

You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?

A.

Specify a negative offset time.

B.

Specify a negative opening period.

C.

Specify a negative planning horizon.

D.

Specify a negative PP/DS horizon.

Full Access
Question # 13

You want to use capacity availability checks for production orders. Which settings have to be made for this?

Note: There are 2 correct answers to this question.

A.

The Relevant for Finite Scheduling indicator must be set.

B.

The scope of check must be defined in Customizing.

C.

A checking rule must be assigned to the work centers.

D.

An overall profile must be assigned in the checking control.

Full Access
Question # 14

Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

Variablesize item

B.

Work item

C.

Preliminary item

D.

WBS item

Full Access
Question # 15

What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

A.

Order type

B.

Requirements profile

C.

Requirements type

D.

Planning strategy

Full Access
Question # 16

Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

A.

Production cost collector

B.

Production version

C.

Repetitive manufacturing profile

D.

Routing

Full Access
Question # 17

What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

A.

You can reschedule the operation using lead time scheduling.

B.

You can reschedule the operation using infinite scheduling in a planning table.

C.

You can reschedule the operation using finite scheduling in a planning table.

D.

You can reschedule the operation in the Manage Work Center Capacity app.

Full Access
Question # 18

What is a work center hierarchy?

A.

A group of alternative work centers for production structured in hierarchy levels by priorities

B.

A group of alternative work centers providing a cumulative available capacity for production

C.

A group of work centers in a production line being used in sequence for production

D.

A group of work centers in a parallel sequence that is used to split production quantities work on them in parallel

Full Access
Question # 19

In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

A.

MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.

B.

MRP creates the capacity requirements without considering existing load on the work centers.

C.

MRP creates the capacity requirements at the earliest possible time.

D.

MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.

Full Access
Question # 20

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.

A.

Queue time

B.

Teardown time

C.

Move time

D.

Setup time

Full Access
Question # 21

Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.

A.

Changing the delivery address in transportation management

B.

Changing the storage bin in warehouse management

C.

Changing the procurement type in the product master

D.

Changing the stock in inventory management

Full Access
Question # 22

You want to set up a maketoorder planning scenario for a finished product. The bill of material contains two components: one should be procured for eac sales order individually the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) select the corresponding Individual/Collective indicator.

B.

Choose planning strategy 20 (MaketoOrder) select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 50 (Planning without final assembly) select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (MaketoOrder) select the corresponding Individual/Collective indicator.

Full Access
Question # 23

During production order creation several valid production versions are found. How does the system choose the production version?

A.

Alphanumeric or quota arrangement

B.

Planned order or material number

C.

Validity period or sales order

D.

Lot size or material cost

Full Access
Question # 24

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

A.

By capacity planning

B.

By order confirmation

C.

By order release

D.

By mass processing

Full Access