Question # 6

Which of the following does the system automatically do when you complete a stability? Correct 3

A.

Trigger a subsequent stability Study

B.

Set the usage decision for all stability inspection lots

C.

Set the system status to completed

D.

Lock all the storage conditions

E.

Lock the test schedule

Full Access
Question # 7

To which of the following quality management basic data can you assign documents from the document management system (DMS)? Note: There are 2 correct answers to this question.

A.

Inspection methods

B.

Codes from code groups

C.

Sampling procedures

D.

Master inspection characteristics

Full Access
Question # 8

Your consumer wants to perform an inspection at the vender's site instead of performing one

during goods receipt.....

Where must you change the settings in the system?

A.

Material master

B.

Vendor master

C.

Purchase order

D.

Quality info record in procurement

Full Access
Question # 9

Which of the following QM business processes can require a user's digital signature?(3 Correct Ans)

A.

Approval of quality notification

B.

UD for an inspection lot

C.

Result recording in the inspection Lot

D.

Manual confirmation of a physical sample drawing

E.

Defective recording in the inspection Lot

Full Access
Question # 10

Your business requirements demand production triggers.

Which of the following events in production can create an inspection lot(3 Correct Ans)

A.

Goods Movement

B.

Order Creation

C.

ATP check

D.

Dead line monitoring /batch monitoring

E.

Order Release

Full Access
Question # 11

During an inspection the lab technicians record the same test values for an

inspection characteristic.

Which of the following do they assign to the products?

A.

As a sample size

B.

As an inspection point

C.

As a partial lot

D.

As a batch

Full Access
Question # 12

Which process step can automatically create a quality notification?

A.

Creation of an inspection Lot

B.

Making a UD

C.

Creation of quality info record

D.

Characteristics result recording

Full Access
Question # 13

Which catalogue types require the use of selection sets? Correct 2

A.

Usage decision

B.

Defect type

C.

Characteristic

D.

Actions

E.

Tasks

Full Access
Question # 14

A buyer wants to quality management department to approve a new vender malarial

-combination.

After activating the QM in procurement process , what the quality management

department ensure in......

Correct 2

A.

A quality agreement for vendor master exists

B.

The material master has a relevant QM Control key assigned to it

C.

The material master has an active inspection type

D.

The inspection plan includes a relevant control key at operation level

E.

A valid release quality info record exists

Full Access
Question # 15

Where do you define the procedure for calculation of the quality score at usage decision?

A.

Usage decision code

B.

Procurement data in the quality management view of the material master

C.

Quality info record: Procurement

D.

Inspection type settings in the material master

Full Access
Question # 16

During an in process inspection for production orders, such as inspection type 09, which inventory posting is possible?

A.

Unrestricted Stock

B.

Blocked stock

C.

None

D.

Quality stock

Full Access
Question # 17

Which QM master data must you maintain to separate a sample into a primary and reserve sample?

A.

Sample size

B.

Sample drawing procedure

C.

Sample determination

D.

Sample processes

Full Access
Question # 18

By integrating the QM component in the production process, you can monitor and document

process capability and the quality of products.

Which statistical and graphical tools does SAP provide to monitor a process ?

A.

Quality management information system

B.

Quality management inspection data interface QM-ID

C.

Statistical report charts

D.

Statistical process controls (SPC)

Full Access
Question # 19

Your customer user action boxes in the notification processing and wants relationships to exist

between the different............'

In which implementation guide activity do you define these relationships ?

A.

Task catalog

B.

Functions for action box

C.

Activity catalog

D.

Customer status scheme

Full Access
Question # 20

Which partner role is available in a standard vendor notification

A.

work center

B.

shipping point

C.

coordinator

D.

sold to party

Full Access
Question # 21

which copy model must user maintain in a Master inspection character to forbid changes in Inspection plan

A.

incomplete copy model

B.

Inspection qualification

C.

Reference characteristics

D.

Complete copy model

Full Access
Question # 22

Which automatic interface does the system use to record results during production with notification

A.

Quality management -impaction data interface (QM-IDI)

B.

Process industry - process control system (PI-PCS)

C.

Quality management information system (QMIS)

D.

Quality management =- statistical interface (QM-ST)

Full Access
Question # 23

Which Status allows you to make a usage decision without using the force inspection competition function for all mandatory characteristic results.

A.

5

B.

1

C.

6

D.

2

Full Access
Question # 24

After you create customer master records, you define second inspection related default specification in the ....

Which of the followings options can you use to control when the quality inspection take place (2 correct ans)

A.

The inspection occurs after the transport order is quit.

B.

The inspection occurs after the release of the sales order

C.

The inspection occurs after the good issue in posted

D.

The inspection occurs before the good issue in posted

Full Access
Question # 25

To use an inspection plan without multiple specification , you must assign a material master and plant. What additional data can you assign to an inspection plan?(2 correct Ans)

A.

Customer

B.

Vendor

C.

Notification type

D.

Inspection type

E.

Search field

Full Access
Question # 26

Working area settings are mandatory for inspection planning within the engineering workbench.

Which of the following are possible focuses for a working area? Note: There are 2 correct answers to this question.

A.

Header

B.

Operation

C.

Inspection characteristic

D.

Classification

Full Access
Question # 27

During which of the following steps in a business process does a dynamic modification rule change severely

A.

Creation of a batch

B.

The creation of a notification

C.

The creation of a inspection Lot

D.

The creation of a certification

Full Access