What is the best way to uniquely distinguish between integrations triggered in SAP Fieldglass?
By default, the maximum number of Reports that can be scheduled at one time is 25. How can the maximum number be increased?
Which configuration is used when Worker rates are dependent on the type of Worker selected for a position?
What gives buyer companies the highest level of control in determining which settings and rules should be used for specific labor positions?
Why is it important to have at least one Task Code assigned to the Worker?
You need to create a Corporate Calendar that allows for regional differences in standard work schedules. What details can the Corporate Calendar Include? Note: There are 2 correct answers to this question.
What is the minimum number of Shifts required when creating a Rate Schedule?
Which of the following functions can be performed in the Push Time Sheets page?
What functionality can be used to find workers who best fit a Job Posting?
Which of the following methods allow you to create a buyer User? Note: There are 2 correct answers to this question.