Question # 6

Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

A.

Confirm time sheets

•Attach documents

B.

Schedule resources

•Change task list

C.

Display maps

•Display and maintain technical objects

D.

Change BOM

•Create a work order on the ESRI map

Full Access
Question # 7

You want to display additional document information within the document flow of a maintenance order.

For which type of document must this be customized?

A.

Invoice

B.

Purchase order

C.

Goods movement

D.

Service entry sheet

Full Access
Question # 8

During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question

A.

Maintenance work center

B.

Maintenance planner group

C.

Organizational unit

D.

Storage location

Full Access
Question # 9

Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question.

A.

Service Product

B.

DIP Profile

C.

Service Work Center

D.

Service Master Record

Full Access
Question # 10

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

Full Access
Question # 11

You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

A.

The effective costs are posted as a credit memo to a price difference account

B.

The effective costs are posted to the respective batch (valuation type).

C.

The goods receipt for the batch refurbished is posted with the value of the standard price.

D.

The goods receipt for the batch refurbished is posted with the value of the moving average price

Full Access
Question # 12

What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?

A.

It is based on an SAP Fiori tile catalog.

B.

It provides only HTML5-based apps

C.

It can be assigned directly to the user via personalization

D.

It is assigned via a portal role.

Full Access
Question # 13

What do you have to consider when setting up phase-based maintenance?

A.

It is mandatory for breakdown and preventive maintenance.

B.

It is not possible to configure the nine delivered phases.

C.

It can be used with any existing order type.

D.

It comes preconfigured when using the relevant Best Practices scope items.

Full Access
Question # 14

Which default object type do you use to settle a refurbishment order?

A.

The cost center

B.

The WBS element

C.

The fixed asset

D.

The material

Full Access
Question # 15

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

A.

Assign a measuring point as a production resources/tools (PRT) to a task list operation.

B.

Assign a piece of equipment with an allocated measuring point to a task list operation

C.

Assign an inspection lot to the task list header

D.

Assign an inspection document as a PRT to the task list operation.

Full Access
Question # 16

What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.

A.

The first due date of a maintenance package

B.

A one-time shift of a maintenance package

C.

A preliminary buffer shifting the reference date of the maintenance order

D.

The call date for the maintenance order

Full Access
Question # 17

A Task List contains two operations:

•Every 3 MON: pump inspection

•Every 24 MON. pump replacement

When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

A.

Assign different hierarchy levels

B.

Set the lead float

C.

Create a task list hierarchy

D.

Create a cycle set sequence

Full Access
Question # 18

Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.

A.

SAP Crystal Reports

B.

Plant Maintenance Information Systems (PMIS)

C.

SAP Lumira

D.

SAP Quick Viewer

Full Access
Question # 19

What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

A.

Goods receipts for external services can be entered.

B.

The planner can change planned costs at the operation level

C.

The planner can change estimated costs only at the header level

D.

The controller can determine actual cost surcharges.

E.

The assignment of the notification to the maintenance order header cannot be deleted.

Full Access
Question # 20

How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?

A.

It always uses the risk-based assessment for prioritization.

B.

It is a new business object with no connection to a maintenance notification.

C.

It is mandatory to assign a task list to the maintenance request.

D.

It contains an additional screening phase where requests can be accepted or rejected.

Full Access
Question # 21

Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

A.

Maintain settings at plant level for usage decisions.

B.

Create a control key which expects inspection characteristic assignments

C.

Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

D.

Assign an Inspection Type to a Maintenance Order Type.

Full Access
Question # 22

You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

A.

Open reservations are recompiled.

B.

Open purchase requisitions are recompiled

C.

Referenced notifications are put in Process again.

D.

Open purchase orders are recompiled.

Full Access
Question # 23

Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

A.

You can configure SAP S/4HANA Cloud via the self-service configuration UI.

B.

You have access to the SAP S/4HANA back-end system

C.

You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network

D.

You do NOT have access to the SAP S/4HANA back-end system.

Full Access
Question # 24

What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

A.

If you use the Resource Scheduling apps, you always dispatch orders and operations.

B.

The order moves to the Preparation phase once it is approved and released

C.

Maintenance Planning Buckets give you a list of non-approved notifications

D.

The configuration of the order type decides whether you use Resource Scheduling or not.