Question # 6

What does measurement refer to?

A.

The process of determining the value and traits of a system, process, or product.

B.

The process of observing a system, process, or product to determine its performance levels.

C.

The process of examining a system, process, or product in order to understand it better.

Full Access
Question # 7

Scenario:

Initar, an IT security service company in New Jersey, provides 24/7 cloud and IT infrastructure support to mid-sized companies. Recognizing the need for a robust business continuity strategy, Initar transitioned from informal business continuity planning to implementing a BCMS based on ISO 22301.

During the BCMS implementation, a major nonconformity was identified: the BIA report lacked a defined Maximum Tolerable Period of Disruption (MTPD), which is required by ISO 22301. The corrective action process began with the IT team conducting a root cause analysis using a cause-and-effect diagram. Based on the analysis, an action plan was drafted to update all BIAs and establish the MTPD. The plan was approved by the head of the IT department, who monitored its implementation, while the internal auditor reviewed the effectiveness of the corrective action.

Which activity of the corrective action process is NOT performed in Scenario 7?

A.

Selection of solutions

B.

Identification of the nonconformity

C.

Analysis of the root cause

Full Access
Question # 8

Scenario:

Belle, a food and beverage processing company, is dedicated to crafting products that meetcustomers' needs while promoting healthier lifestyles. Central to its mission is a commitment to upholding the highest food safety standards and ensuring the consistent quality of their offerings. From the initial stages of preparation through processing, packaging, and transportation, Belle maintains rigorous control over every aspect of food production.

Recognizing the importance of resilience in potential disruptions, Belle adopted a business continuity management system (BCMS) based on ISO 22301. By implementing this system, Belle aimed not only to ensure uninterrupted product delivery but also to enhance its reputation, foster customer confidence, and gain a competitive edge. To oversee the BCMS implementation, Belle appointed a dedicated business continuity project team responsible for leading the BCMS implementation project. It also assigned a business continuity manager responsible and accountable for the BCMS overall.

Before initiating the BCMS implementation, the BCM team conducted a thorough analysis of the stakeholders involved. Using specialized tools, they categorized stakeholders according to their influence, expected level of involvement, and anticipated contribution throughout the implementation of the BCMS and related activities.

Throughout the BCMS implementation process, Belle’s top management emphasized the integration of business continuity principles into existing processes, aligning them with the organization's strategic objectives. They developed the business continuity objectives and the BCMS scope. To ensure widespread understanding and adoption of the BCMS among employees, the BCM team developed an instructional video explaining the business continuity policy. Recognizing the unfamiliarity of employees with business continuity terminology, the team subsequently devised a comprehensive training program aimed at enhancing staff competence in BCMS matters. This initiative not only educated employees about the policy but also underscored the benefits of improved business continuity performance.

The organization also established evaluation methods to assess the impact of competence trainings. It measured the staff engagement and retention levels, as well as performance against training objectives.

As Belle continued to innovate and expand its product and service offerings, the organization revisited its BCMS scope to remain aligned with evolving priorities. Recent additions to the scope included a new department and two new products aligning with its updated business continuity objectives to enhance the safety of raw materials and key ingredients.

In response to potential disruptive risks, Belle established clear protocols outlining specific actions to be taken, assigning responsibilities, and defining criteria for evaluating the effectiveness of these measures. By proactively addressing risks and fortifying its resilience, Belle aimed to uphold its dedication to delivering safe, top-quality products while also safeguarding the interests of its stakeholders.

As stated in Scenario 3, the BCM team communicated the importance of the BCMS and explained the policy through a video. Is this acceptable?

A.

Yes, sharing a video in which the policy is explained is also a valid method of communication.

B.

No, the business continuity policy should only be communicated verbally by the top management.

C.

No, the business continuity policy should be communicated formally, such as through emails, meetings, rather than through alternative means.

Full Access
Question # 9

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

The top management granted the outsourced internal auditor unrestricted access to employees and documented information necessary to conduct an effective audit. Is this appropriate?

A.

Yes, internal auditors should have unrestricted access to executives, employees, and information.

B.

No, outsourced internal auditors cannot have unrestricted access to employees and documented information for confidential reasons.

C.

No, outsourced internal auditors can have unrestricted access only to employees but not to documented information.

Full Access
Question # 10

Scenario:

Initar, an IT security service company in New Jersey, provides 24/7 cloud and IT infrastructure support to mid-sized companies. Recognizing the need for a robust business continuity strategy, Initar transitioned from informal business continuity planning to implementing a BCMS based on ISO 22301.

During the BCMS implementation, a major nonconformity was identified: the BIA report lacked a defined Maximum Tolerable Period of Disruption (MTPD), which is required by ISO 22301. The corrective action process began with the IT team conducting a root cause analysis using a cause-and-effect diagram. Based on the analysis, an action plan was drafted to update all BIAs and establish the MTPD. The plan was approved by the head of the IT department, who monitored its implementation, while the internal auditor reviewed the effectiveness of the corrective action.

According to Scenario 7, the internal auditor followed up on the corrective action and reviewed its effectiveness. Is this acceptable?

A.

Yes, based on ISO 22301, after implementing any actions needed, a review of the effectiveness of corrective actions should happen.

B.

No, based on ISO 22301, it is not the responsibility of the internal auditors to review the effectiveness of corrective actions.

C.

Yes, only if a review of the effectiveness of corrective actions is really necessary.

Full Access
Question # 11

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

In Scenario 8, the certification body accepts Operons Inc.’s rejection of the auditor and appoints another one. Is this acceptable?

A.

No, the auditor can be rejected only if a conflict of interest situation is present.

B.

Yes, previously displayed unprofessional conduct is a valid reason to replace an auditor.

C.

Yes, the auditor has previously audited the company against ISO 9001, which is a valid reason for replacing the auditor.

Full Access
Question # 12

According to ISO 22301, what should the top management ensure when establishing the business continuity policy?

A.

That the policy includes a commitment to satisfy applicable requirements.

B.

That the policy is communicated to and approved by all external parties of the organization.

C.

That the policy specifies all legal and regulatory requirements.

Full Access
Question # 13

What is one of the responsibilities of an internal auditor?

A.

Prepare the organization for external audits.

B.

Determine and ensure the provision of all necessary resources for the audit.

C.

Schedule the frequency of internal audits.

Full Access
Question # 14

Scenario:

Headquartered in Sri Lanka, Operons Inc. is a freight forwarding company that adopted a BCMS aligned with ISO 22301. Prior to the certification audit, Operons Inc. measured gaps between their BCMS and the standard's requirements to ensure compliance. The certification body was contracted to conduct the audit, and a biased auditor from a previous ISO 9001 audit was replaced upon request. During the audit, two minor nonconformities were identified, and the audit team issued a recommendation for certification.

Based on Scenario 8, Operons Inc. contracted the same certification body that had conducted the ISO 9001 audit and requested more information about the competence and skills of the audit team. Is this acceptable?

A.

No, the same certification body cannot be contracted to audit two management systems in the same organization.

B.

No, the auditee cannot ask about the competence and skills of the audit team; that is the responsibility of the certification body.

C.

Yes, competence and skills of the audit team are among the main criteria in selecting a certification body.

Full Access
Question # 15

What must be included in a business continuity plan, among others?

A.

Reporting requirements

B.

Risk assessment

C.

Legal and regulatory requirements

Full Access
Question # 16

An organization is being audited by an independent organization to ensure conformity to the specified criteria. What type of audit is the organization conducting?

A.

First party

B.

Second party

C.

Third party

Full Access
Question # 17

How should organizations determine the intervals for training?

A.

Random intervals in order to avoid predictability and foster adaptability.

B.

Fixed intervals in order to establish consistent planning of training programs and regular training tracking.

C.

Based on the specific responsibilities and needs of personnel in order to fulfill organizational needs.

Full Access
Question # 18

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

Based on Scenario 4, the top management of NexTech ensured the involvement and commitment of all levels of the organization. What did they achieve?

A.

Fostering ethics and integrity

B.

Engagement of personnel

C.

Segregation of duties and responsibilities

Full Access
Question # 19

Scenario:

Teleconn, a UK-based telecommunications provider, initiated a BCMS based on ISO 22301 to ensure reliable and consistent services. To monitor the BCMS’s performance, the internal audit function was outsourced to a company specializing in auditing services. The outsourced internal auditor was given unrestricted access to employees and documented information necessary for an effective audit.

According to Scenario 6, considering that the review occurred during a regular management meeting rather than a specially scheduled session, the top management did not find it necessary to document the results of the management review. Is this in accordance with ISO 22301?

A.

No, ISO 22301 requires organizations to retain documented information as evidence of the results of management reviews.

B.

Yes, ISO 22301 does not require organizations to retain documented information as evidence of the results of management reviews when they are conducted in regular management meetings.

C.

Yes, the organization must retain documented information on management review results only when major changes are planned to be implemented in the BCMS.

Full Access
Question # 20

What is the purpose of plan review exercise methods?

A.

Enable teams to practice working together and making decisions under more stressful time frames.

B.

Familiarize participants with new or updated content.

C.

Prepare participants for disruptions that impact the entire organization.

Full Access
Question # 21

What is the primary objective of a business impact analysis (BIA) within a BCMS?

A.

To establish roles and responsibilities within the organization.

B.

To identify and assess the impact of disruptions on critical business operations.

C.

To document the organization's business continuity policy.

Full Access
Question # 22

Scenario:

Prebank is a multinational financial institution. Its services include banking and investing through banking centers, ATMs, and mobile banking platforms. With millions of clients, Prebank's database systems record vast amounts of data and transactions daily. Its main activities depend on the ability of its employees to access clients' data through its database system at any time.

Recently, Prebank's database system stopped working unexpectedly. Soon after, it was discovered that this disruption was caused by the maintenance work on the road outside the company's office building. During the road repair, the workers had unintentionally damaged a water pipe that leaked into Prebank's basement. This leakage affected the company's electrical infrastructure, resulting in a loss of power, which shut down equipment and computers in the server room. Consequently, employees were unable to access Prebank's database system.

After this incident, the employees immediately notified Prebank's IT team. Subsequently, the IT team informed both the maintenance company responsible for the roadworks and the insurance company. The company responsible for maintenance told Prebank's IT team that the maintenance team was not available for the day. Since Prebank did not have a plan for responding to similar disruptions, they had to stop working and go home. Thankfully, the maintenance team arrived at the scene on the next day and made all the necessary repairs, allowing Prebank to resume all itsoperations.

Following these events, Prebank decided to change its strategy and procedures to prioritize business continuity planning within the company. Its main focus was to address the root cause of disruptions to improve business continuity. As such, the top management decided to implement a Business Continuity Management System (BCMS) based on ISO 22301.

After setting the company's business continuity objectives, the company established a project team, including a project manager and four additional team members. The BCM team was responsible for managing the BCMS implementation process, whereas the top management was responsible for the effectiveness of the BCMS. Through analyzing potential risk scenarios, the team defined Prebank's business continuity strategy as well as the resources for supporting business continuity within the company. This enabled the team to predict the impact of disruptions caused by various incidents, such as power outages. Following these actions, the company established a business continuity plan to manage disruptions effectively without impacting the workflow.

The effective implementation of the BCMS helped Prebank not only minimize losses and ensure continuity in its services but also absorb and adapt to a changing environment.

Which of the following situations indicates that Prebank has conducted a Business Impact Analysis (BIA)?

A.

Based on its analyses, Prebank was able to predict the impact of disruptions caused by power outages.

B.

Prior to establishing the business continuity plan, Prebank determined the resources needed to support business continuity.

C.

Prebank defined a business continuity plan which addressed how the organization would react to major disruptions.

Full Access
Question # 23

Scenario:

NexTech Innovations, a dynamic tech startup located in Seoul, South Korea, is renowned for its advancements in artificial intelligence and robotics. Serving a global clientele, NexTech encountered a sudden obstacle when a critical supplier abruptly ceased operations, disrupting their supply chain and threatening their ability to deliver products on schedule. Recognizing the need for resilience, NexTech initiated the implementation of a robust business continuity management system (BCMS) based on ISO 22301.

NexTech's top management established a project team of five members and appointed Rebecca, the lead operations manager, as the project manager. The BCM team was tasked with the effective implementation of the BCMS in line with ISO 22301 requirements. Rebecca worked with the top management to analyze the internal context of the company to define the BCMS scope, focusing on assessing and determining who is responsible for coordinating and managing activities at different organizational levels.

The project team divided the implementation project into smaller tasks, identifying the personnel, equipment, and materials needed for each. Rebecca personally handled resource allocation to implement and support the BCMS. Meanwhile, the top management ensured active involvement and commitment at all levels of the organization to enhance the BCMS's effectiveness.

Rebecca and the team drafted and published the business continuity policy on the company’s website. However, some employees found the technical jargon challenging to understand, so comprehensive training sessions were held to address this issue. These measures strengthened NexTech’s resilience and enhanced client trust by proactively addressing potential disruptions.

According to Scenario 4, what method was used to estimate resources for the BCMS implementation project in NexTech?

A.

Public estimation data

B.

Alternative analysis

C.

Bottom-up estimation

Full Access