Black Friday Sale - Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70dumps

1z0-1075-24 Questions and Answers

Question # 6

Which three statements are true about executing rework work orders with manual control?

A.

You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.

B.

You can cancel the work order after releasing it and after performing any transactions.

C.

You must manually issue the assembly item to rework a work order, either partial or full quantity.

D.

You cannot cancel the work order after releasing it or after performing any transactions.

E.

If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.

Full Access
Question # 7

Which option represents all the production exception types that can be reported by a Production Operator in Oracle Manufacturing Cloud?

A.

Work Area, Work Center, and Resources

B.

Work Area. Work Center. Resources, Components, and Miscellaneous

C.

Resources and Components

D.

Work Center and Resources

E.

Work Area, Work Center, Resources, and Components

Full Access
Question # 8

Which three statements are true about the main areas of Managerial Accounting?

A.

Receipt Accounting Is the application that performs accrual accounting for all types of receipts.

B.

Landed Cost Management gives organizations financial visibility into their extended supply chain costs.

C.

Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation Is initiated.

D.

Cost method can be defined with granularity down to individual Items.

Full Access
Question # 9

A Manufacturing Engineer in a plant is creating an alternate manufacturing process for an item using its existing work definitions. After copying from the existing work definition, WD1, to the alternate work definition, WD2, the engineer finds that the operation items were not copied in the alternate manufacturing process WD2.

What is the reason for this?

A.

Production Priority was not populated in the new WD2 during creation.

B.

Item and Structure Name in the existing WD1 were retained in the new WD2 during creation.

C.

Item and Structure Name were changed in the new WD2 during creation.

D.

Start Date was not populated in the new WD2 during creation.

Full Access
Question # 10

A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.

How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

A.

Set up the machines with a cost element type of "Resource" by selecting Cost Element Set Common.

B.

Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set ABC.

C.

Set up the machines with a cost element type of "Resource" by selecting Cost Element Set ABC.

D.

Set up the machines with a cost element type of "Overhead" by selecting Cost Element Set Common.

Full Access
Question # 11

Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.

Which key setup can they use to achieve this?

A.

Enable IoT Fleet Monitoringand enable synchronization to IoT Production Monitoring in Plant Parameters.

B.

Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" In Plant Parameters.

C.

Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production Monitoring" In Inventory Organization.

D.

Enable IoT Asset Monitoring and turn on "Enable synchronization to IoT Asset Monitoring" in Resources.

E.

Enable IoT Production Monitoring and turn on "Enable synchronization to IoT Production

Full Access
Question # 12

In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

A.

Supply Chain Orchestration initiates the creation of a purchase order without the work order.

B.

Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

C.

Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.

D.

Supply Chain Orchestration initiates the creation of a requisition with the project details.

E.

Expenditure Type is sat to the expenditure type associated to the outside processing Item.

Full Access
Question # 13

In the work execution area, which three infolets are provided to users for instant access?

A.

Work Order Performance

B.

Scrap

C.

Operation Exception

D.

Operation Efficiency

E.

work order Exception

Full Access
Question # 14

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must they perform and verify in the Work Definition area?

A.

Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.

B.

Ensure the predefined work definition name ORA_MAIN is active.

C.

Ensure the item is a standard item with a secondary item structure.

D.

Ensure there is only one default standard operation at any point in time.

E.

Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.

Full Access
Question # 15

A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.

What is the correct sequence of steps to achieve this?

A.

Associate R2 with WC1 > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

B.

Associate R2 with WC1> Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

C.

Associate R2 with WCI > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 in the Day Shift column > Enter 2 in the Night Shift column.

D.

Associate R2 with WCI > Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 In the Day Shift column > Enter 2 In the Night Shift column.

Full Access