Question # 6

A change is desired in a project after the requirements are signed off and after technical design has started. The stakeholders want an additional product to be developed as part of the project. What tool can be used by the business analyst (BA) to assess the impact of the change?

A.

Concept modelling

B.

Requirements architecture

C.

Backlog management

D.

Balanced scorecard

Full Access
Question # 7

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Full Access
Question # 8

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Full Access
Question # 9

The business analyst (BA) is helping the business stakeholders prioritize requirements for a new customer portal for managing orders, delivery, and payment information. A number of requirements address compliance with regulations regarding access for people with disabilities. What factor should the BA use to guide the stakeholders when assigning a priority for these specific requirements?

A.

Dependencies

B.

Penalties

C.

Risk

D.

Stability

Full Access
Question # 10

A stakeholder has requested an extremely detailed resolution to an issue during current state analysis that may consume about 20% of the estimated project effort. How should the business analyst (BA) handle the situation?

A.

Ask the project sponsor for additional funding

B.

Escalate the request to the project manager for reevaluation of the plan

C.

Spend the required effort to develop the detail

D.

Explain that the degree of effort may not be necessary at this stage

Full Access
Question # 11

A newly implemented personal loan financing system has been in operation for one month. The business objective is to reduce the loan processing time from 11 days to 3 days but it is currently occurring in 4.5 days. What must the business analyst (BA) do next?

A.

Validate the performance measure

B.

Analyze the current state

C.

Assess the risks

D.

Determine requirements changes

Full Access
Question # 12

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Full Access
Question # 13

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Full Access
Question # 14

During a lesson learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:

A.

evaluate whether the required return on investment is met.

B.

gather insights into the value provided by a solution.

C.

decide if similar projects should be taken up again.

D.

verify that organizational resources were spent wisely.

Full Access
Question # 15

During a senior management meeting about a project at the requirements analysis stage, a business analyst (BA) stated that there were a number of workarounds associated with the current application. The Chief Information Officer (CIO) was looking for ways to improve the situation and the BA suggests a solution. Which of the following can the BA suggest that the organization consider to increase efficiencies?

A.

Process improvement

B.

Strategy realignment

C.

Capability assessment

D.

Project abandonment

Full Access
Question # 16

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

A.

Manage conflicts and issues

B.

Track and communicate approval

C.

Gain consensus

D.

Understand stakeholder roles

Full Access
Question # 17

A new contract requires a thorough level of documentation to be developed and maintained with planned phases of reviews and authorized sign offs. Which approach fits this contract?

A.

Waterfall

B.

Agile

C.

Scrum

D.

Iterative

Full Access
Question # 18

A business analyst (BA) is working on a project that has a release date that cannot be changed. The BA engaged with stakeholders and completed the business requirements elicitation task. Upon review with the rest of the project team, it is determined that not all requirements can be implemented by the set deadline. What must the BA do to ensure maximum business value?

A.

Ensure test scenarios conform to business requirements

B.

Choose an appropriate format to communicate requirements

C.

Analyze requirements to remove unnecessary components

D.

Align business requirements to organizational strategy

Full Access
Question # 19

A business analyst (BA) is working on a project that has a number of stakeholder conflicts and issues. The BA is finding it difficult to resolve the conflicts and issues effectively. What should the BA do to prevent a similar situation in the future?

A.

Plan business analysis governance

B.

Verify requirements

C.

Perform stakeholder analysis

D.

Validate requirements

Full Access
Question # 20

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modelling formats will show the requirements for both systems side by side?

A.

Activity Flow

B.

Matrix

C.

Glossary

D.

Bubble Chart

Full Access
Question # 21

Stakeholder requirements where approved for a business process reengineering initiative along with the Creation of a | roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

A.

Requirement performance measures

B.

Scope model

C.

Requirement description

D.

Requirement attribute values

Full Access
Question # 22

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

A.

The trade-off and value to stakeholder

B.

The strategy alignment with the balanced scorecard

C.

The total cost of ownership of the project

D.

The strategy design options

Full Access
Question # 23

The Chief Executive Officer (CEO) of a company presents a new corporate strategy that will introduce a new system to the organization. The CEO has expressed a concern about the impact to the staff once the strategy has been implemented. What must the business analyst (BA) do to address concerns of the CEO?

A.

Identify required cultural changes

B.

Perform a cost-benefit analysis of the strategy

C.

Ensure requirements are easily accessible

D.

Align the new capabilities to the company's architecture

Full Access
Question # 24

A business analyst (BA) held a formal walk through of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

A.

Ensure appropriate templates used throughout elicitation

B.

Ensure consistent referencing of requirements

C.

Ensure compliance with key performance indicators

D.

Ensure correct terminology is used

Full Access
Question # 25

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Full Access
Question # 26

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

A.

Priority

B.

Complexity

C.

Necessary

D.

Source

Full Access
Question # 27

A business analyst (BA) plans to organize a focus group to bring all the interested parties together and discuss the issues and possible risks for the new initiative. Due to the geographical differences of each participant a videoconferencing service will be used to satisfy stakeholder preferences. Which approach is the BA defining?

A.

Stakeholder analysis

B.

Issue management

C.

Release planning

D.

Stakeholder collaboration

Full Access
Question # 28

A business analyst (BA) has spent the week conducting work sessions with a project's key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?

A.

Validating requirements

B.

Eliciting requirements

C.

Verifying requirements

D.

Approving requirements

Full Access
Question # 29

A business analyst (BA) is assigned a new project and is beginning to prepare for elicitation. Which task must the BA complete before preparation of the elicitation process can begin?

A.

Coordinate meeting logistics

B.

Approve anticipated expenses

C.

Gather contact information of stakeholder

D.

Collect information on the business need

Full Access
Question # 30

A company has bought a customizable software product and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

A.

Develop a data model

B.

Create a process model

C.

Review data flow diagrams

D.

Observe the activity

Full Access
Question # 31

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

A.

Compare requirements with compliance requirements

B.

Determine the communication plan for requirements

C.

Reassure the project sponsor that testing will be conducted diligently

D.

Ensure requirements are traceable up to user acceptance testing

Full Access
Question # 32

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture the information in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

A.

Predictive

B.

Reactive

C.

Proactive

D.

Adaptive

Full Access
Question # 33

A solution that was implemented several years ago has achieved its stated objective of consolidating data from multiple sources. However, end user feedback reveals problems and inefficiencies. What should the business analyst (BA) do first?

A.

Perform a root cause analysis

B.

Recommend corrective measures

C.

Identity any lessons learned

D.

Revise the business objectives

Full Access
Question # 34

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

A.

Risk-neutral

B.

Risk-optimizing

C.

Risk-averse

D.

Risk-soaking

Full Access
Question # 35

The emergence of self-driving vehicles has disrupted the auto insurance industry. The Chief Information Officer (CIO) has asked the business analyst (BA) to modify the existing business model to include self-driving vehicles. Which of the following will be valuable information for the BA to use?

A.

Vision and mission statement

B.

Project charter

C.

Business architecture framework

D.

Organizational structure

Full Access
Question # 36

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

A.

Organizational performance standards

B.

Information management approach

C.

Modelling notations standards

D.

Business analysis approach

Full Access
Question # 37

A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following help to ensure that the correct information about the requirements is provided to the participants?

A.

Requirements architecture

B.

Stakeholder list

C.

Standard templates and syntax

D.

Roles and permissions matrix

Full Access
Question # 38

Which tool will allow a business analyst (BA) to determine how information is input, processed, stored, and extracted from a collection of systems?

A.

Data Glossary

B.

Activity Flow

C.

Entity Relationship Diagram

D.

Data Flow Diagram

Full Access
Question # 39

The business analysis deliverables went through a formal performance review process. The performance report stated that changes to the business analysis approach must be made in order to maximize the project's chances of success. Who must be consulted regarding these changes before they are implemented in this project?

A.

The project manager

B.

The lead developer

C.

The enterprise architect

D.

The subject matter expert

Full Access
Question # 40

A business analyst (BA) develops a template to document the product feature requirements for an enterprise software solution. Within the template, the BA includes the following additional information: source, priority level, level of complexity, and last modified date. What does the additional information describe?

A.

Requirement analysis

B.

Requirement traceability

C.

Requirement attributes

D.

Requirement management

Full Access
Question # 41

A project team member is confused about why a small change requires the team to look at the different enterprise-level business objectives when a desired state can be achieved easily without this analysis. What can the business analyst (6A) do to help the team member understand?

A.

Impact analysis helps gain critical thinking to achieve the desired solution.

B.

Detailed assessments might result in future success of other projects

C.

Proper analysis from difference aspects in required to select the best solution.

D.

When funding is available for extra analysis the project team need to use it.

Full Access
Question # 42

A business analyst (BA) is working on a project to revise the way a company bills its customers. At the onset of the project, the BA creates the following matrix:

A.

Stakeholder analysis

B.

Strategy analysis

C.

Root cause analysis

D.

Business capability analysis

Full Access
Question # 43

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap. Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) update in the stakeholder requirements?

A.

Requirement attribute values

B.

Scope model

C.

Requirement description

D.

Requirement performance measures

Full Access
Question # 44

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

A.

The models are used for analysis and refining requirements and design.

B.

The models did not change the value to text-based requirements.

C.

The models are part of the technical documents and not part of BRD documents.

D.

The models were included as a mistake because Use Case diagrams are technical.

Full Access
Question # 45

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

A.

The strategic design options

B.

The trade-off and value to stakeholders

C.

The strategic alignment with the balanced scorecard

D.

The total cost of ownership of the project

Full Access
Question # 46

The business analyst (BA) is investigating techniques that would be appropriate for determining how and who uses data across the identified processes. Which technique should the BA select?

A.

CRUD (Create, Read, Update, and Delete) matrix

B.

Stakeholder list, map, or personas

C.

Data dictionary

D.

Decision model

Full Access
Question # 47

A new regulation results in organizations needing to change online contractual wording. A business analyst (BA) has elicited the requirements and documented them in a change control request. Where will the BA find out which stakeholder has the authority to approve, deny, or defer the change request?

A.

Information management

B.

Business analysis approach

C.

Governance approach

D.

Stakeholder engagement approach

Full Access
Question # 48

A business analyst (BA) has been tasked with examining and analyzing the relationship between a set of requirements by verifying that they are unambiguous. What will the BA be looking for?

A.

That the relationship is necessary for understanding the requirements holistically.

B.

That relationships are described in the same way, using the same set of standard descriptions.

C.

That there is a genuine relationship and that the type of relationship is described.

D.

That there are no relationships that link elements in two different and conflicting ways.

Full Access
Question # 49

A newly implemented personal loan financing system has been in operation for one month. The business objective is to reduce the loan processing time from 11 days to 3 days, but it is currently occurring in 4.5 days. What must the business analyst (BA) do next?

A.

Analyze the current state

B.

Determine requirements changes

C.

Validate the performance measures

D.

Assess the risks

Full Access
Question # 50

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations. Which of the following does the BA need to adjust to handle this situation?

A.

Elicitation scope

B.

Elicitation technique

C.

Project stakeholders

D.

Logistics setup

Full Access
Question # 51

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

A.

Developing the project plan

B.

Validating the requirements

C.

Outlining the change control strategy

D.

Defining the solution approach

Full Access
Question # 52

Several user groups are impacted by a proposed change to their daily workflow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

A.

Establish a communication plan

B.

Create business process models

C.

Develop a data model diagram

D.

Write functional requirements

Full Access
Question # 53

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

A.

Business analysis approach

B.

Organizational performance standards

C.

Modeling notations standards

D.

Information management approach

Full Access
Question # 54

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

A.

Adaptive development process

B.

Crystal clear development process

C.

Kanban development process

D.

Predictive development process

Full Access
Question # 55

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

A.

Decision modeling

B.

Mind mapping

C.

SWOT analysis

D.

Functional decomposition

Full Access
Question # 56

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low-value requirements can be de-scoped and the project remains within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

A.

Dependencies

B.

Data flow

C.

Functional decomposition

D.

Traceability

Full Access
Question # 57

Market studies projected a 28% year-over-year growth for five (5) years for commercial vehicle loans. A company that provides lending for commercial vehicles wanted to keep up with industrydemand; however, their applications were not capable of scaling to the increased demand for loan processing and billing. The company is deploying a new system to meet the demand. The project started five (5) years ago and cost $2 million USD. The project metrics are to be evaluated after five (5) years. The return on investment (ROI) for the project is calculated at 11%. The project sponsors are upset that the desired ROI for the project was not met. What was the root cause of this issue?

A.

Demand forecasting

B.

Capability planning

C.

Risk planning

D.

Flawed assumptions

Full Access
Question # 58

After a number of requirements elicitation workshops, the business analyst (BA) notices that two business stakeholders did not speak up during any of the discussions. What should the BA do in the next workshop?

A.

Allow only the two stakeholders to speak so that other stakeholders hear their input.

B.

Ask all attendees for their input, ensuring that each stakeholder is given time to speak and provide their opinion.

C.

Omit the two stakeholders from the next meeting since they do not seem to be engaged.

D.

Proceed as normal, assuming that the two business stakeholders will speak up if and when they are ready.

Full Access
Question # 59

A business analyst (BA) is managing stakeholder collaboration to ensure positive reactions are capitalized upon. There is uncertainty as to whether the correct stakeholders have been identified. Which technique can be used to correct this situation?

A.

Functional decomposition

B.

Risk analysis

C.

Interviews

D.

Lessons learned

Full Access
Question # 60

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

A.

Surveys or Questionnaires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modeling from previous initiatives

Full Access
Question # 61

A business analyst (BA) has structured information so it is easy to find, does not conflict with other information, and is not duplicated unnecessarily. Which additional factor does the BA need to take into account when deciding how to structure the information?

A.

The number of stakeholders to be consulted

B.

The governance and engagement approach to be used

C.

The level of experience with the repository tool

D.

The size and complexity of the change

Full Access
Question # 62

For a new accounts payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

A.

"The solution will enable account holders to make account payments via a web form."

B.

"The solution will send payment notification to the account holder after successful processing."

C.

"The solution will report the average number of days an account payment is outstanding."

D.

"The solution will reduce the payment processing time from three days to two days."

Full Access
Question # 63

The business analyst (BA) is preparing for a requirements review with a group of stakeholders. The BA must determine how best to model the requirements for the review. Which of the following guidelines and tools will the BA use?

A.

Current state description

B.

Domain knowledge

C.

Methodologies and framework

D.

Requirements architecture

Full Access
Question # 64

A business analyst (BA) elicits requirements from end users for a new application and then documents a set of use cases and use case scenarios. What should the BA do next?

A.

Create acceptance and evaluation criteria

B.

Review the use case scenarios

C.

Identify all the roles and responsibilities

D.

Conduct a requirements workshop

Full Access
Question # 65

A business analyst (BA) is proposing design options and a number of opportunities are occurring that need to be understood further. One particular opportunity will prevent different stakeholders from performing the same function in distinctly different ways. What type of opportunity is this?

A.

Increased efficiency

B.

Reduced barriers to entry

C.

Additional capabilities

D.

Improved access to information

Full Access
Question # 66

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

A.

Demonstrate the functionality of the new CRM

B.

Create merged viewpoints of the requirements

C.

Ensure all regulatory requirements are documented

D.

Reuse requirements models from each company

Full Access
Question # 67

A company wants to increase its market share in the industry, and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off, and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

A.

Allocate requirements to different releases

B.

Recommend a reduction in the project scope

C.

Ensure all requirements are traceable using a matrix

D.

Redefine the business requirements associated with each implementation

Full Access
Question # 68

A business analyst (BA) is preparing for a requirements review with a group of stakeholders. The BA must determine how best to model the requirements for the review. Which of the following guidelines and tools will the BA use?

A.

Current state description

B.

Domain knowledge

C.

Methodologies and framework

D.

Requirements architecture

Full Access
Question # 69

A finance manager wants to begin a new project to replace the existing expense processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

A.

Business process to uncover inefficiencies and failing control points

B.

Finance solution vendors for inclusion in a Request for Information

C.

Enterprise information model to ensure definitions are still valid

D.

Submission processes to determine which activities can be fully automated

Full Access
Question # 70

A business owner has identified a high-priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to conduct an impact analysis of this change. Which factor will the BA need to consider?

A.

Selection of the elicitation techniques for the requirement.

B.

Number of systems being affected by the requirement.

C.

Original source of the requirement.

D.

Method of requirement communication.

Full Access
Question # 71

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

A.

Source

B.

Complexity

C.

Necessary

D.

Priority

Full Access
Question # 72

A company has bought a customizable software product, and the vendor's business analyst (BA) is visiting the company's office to perform a requirements assessment. The business sponsor expresses an interest in improving a specific process that is in scope. What should the BA do?

A.

Create a process model

B.

Review data flow diagrams

C.

Develop a data model

D.

Observe the activity

Full Access
Question # 73

A business analyst (BA) spent three months eliciting, specifying, and modeling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

A.

Understand stakeholder roles

B.

Track and communicate approval

C.

Manage conflicts and issues

D.

Gain consensus

Full Access
Question # 74

A project is being initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

A.

Resolve differences of opinion

B.

Conduct an impact analysis

C.

Estimate the scope of work

D.

Perform a feasibility study

Full Access
Question # 75

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics:Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

A.

To validate requirements

B.

To measure solution performance

C.

To compare solution options

D.

To verify requirements

Full Access
Question # 76

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with an emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is:

"As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school."

The product owner wants to take advantage of this opportunity to provide the staff with a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing objectives?

A.

Add the functionality to the list of requirements.

B.

Review business objectives and determine potential value.

C.

Ask the product owner to rank this user story against the existing product backlog.

D.

Suggest that the story be included with a change to the solution scope or be removed.

Full Access
Question # 77

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

A.

Risk review

B.

Quality control checklist

C.

Decision analysis

D.

Communication plan

Full Access
Question # 78

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modeling formats will show the requirements for both systems side by side?

A.

Bubble Chart

B.

Activity Flow

C.

Glossary

D.

Matrix

Full Access
Question # 79

During planning, elicitation, and sign-off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?

A.

Communication

B.

Information

C.

Collaboration

D.

Trustworthiness

Full Access
Question # 80

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

A.

Risk analysis and management

B.

Acceptance and evaluation criteria

C.

Requirements management tools

D.

Legal and regulatory information

Full Access
Question # 81

A business analyst (BA) has developed requirements for a project containing sensitive information. The requirements were approved, and the solution was implemented. What should the BA do to ensure these requirements are maintained for future reference?

A.

Store the requirements package on a secure shared drive.

B.

Send the requirements package to stakeholders in a password-protected email.

C.

Print the requirements package and distribute it to stakeholders in person.

D.

Archive the requirements package in the business analysis portal.

Full Access
Question # 82

Beth is the business analyst for her organization and she wants to be certain that she and her team follow the correct procedures for enterprise analysis. What document can provide the governances for enterprise analysis efforts?

A.

Organizational process assets

B.

Enterprise environmental factors

C.

Business analysis plans

D.

Project charter

Full Access
Question # 83

When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the forward tracing activity called in requirements traceability?

A.

Lineage tracking

B.

Backwards pass

C.

Derivation

D.

Allocation

Full Access
Question # 84

Some of the requirements in the solution must be completed because of laws and regulations in your industry.

Management would like you, the business analyst, to rank the requirements according to the relevant laws. What type of requirements prioritization is management having you complete?

A.

Business value ranking

B.

Risk ranking

C.

Constraint ranking

D.

Regulatory ranking

Full Access
Question # 85

In a change-driven environment, what's more important than formal communications in regard to effective requirements management?

A.

Correct communication

B.

Frequency of communication

C.

Message of communication

D.

Type of communication

Full Access
Question # 86

What business analysis process is needed to define the solution scope and prepare the business plan for the endeavor?

A.

Verify requirements.

B.

Define requirements management and communication.

C.

Prioritize requirements.

D.

Determine solution approach.

Full Access
Question # 87

What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

A.

Risk-driven

B.

Profit-driven

C.

Change-driven

D.

Risk-laden

Full Access
Question # 88

In order to define the business need for an organization, there are two inputs. What are the two inputs a business analyst will need to define the business need?

A.

Business goals and objectives

B.

Stakeholder identification and stakeholder analysis

C.

Requirements and Business analysis approach

D.

Elicitation approach and Solution approach

Full Access
Question # 89

As a business analyst, you'll often have to coach stakeholders on the processes, knowledge areas, and tasks

you'll complete for an organization. One of the knowledge areas is enterprise analysis. This knowledge area completes all of the following activities except for which one?

A.

It defines the nature of a solution that meets that need.

B.

It identifies business needs, problems, or opportunities.

C.

It justifies the investment necessary to deliver that solution.

D.

It manages and expresses requirements to a broad and diverse audience.

Full Access
Question # 90

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following will help determine whether a plan- driven or change-driven approach is appropriate?

Each correct answer represents a complete solution.

A.

Organizational process assets

B.

Expert Judgement

C.

Business need

D.

Penalty of not seizing the opportunity

Full Access
Question # 91

Which one of the following is not an event-based elicitation technique?

A.

Focus group

B.

Interface analysis

C.

Interview

D.

Workshop

Full Access
Question # 92

Business needs do not always originate from the business analyst or from business owners. There are several stakeholders which may identify or contribute to the identification of a business need. Which one of the following stakeholders are most likely to have the most direct awareness of problems that could lead to a business need?

A.

End users

B.

Business analysts

C.

Project managers

D.

Functional managers

Full Access
Question # 93

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. This approach helps to find out the following except for which one?

A.

Which stakeholders need to be involved in the decision?

B.

Who will be consulted regarding and informed of the approach?

C.

Who will be observed in job shadowing?

D.

What is the rationale for using it?

Full Access
Question # 94

What type of requirements elicitation technique is the Delphi Technique?

A.

Survey

B.

Workshop

C.

Prototyping

D.

Round table

Full Access
Question # 95

You are working with several business analysts to determine the solution approach for an identified problem. All of the following techniques are acceptable for identifying the solution approach except for which one?

A.

Benchmarking

B.

Brainstorming

C.

Decision analysis

D.

Risk analysis

Full Access
Question # 96

Henry and Fred are working together on business analysis duties for the implementation of new software. Henry, the business analyst, tells Fred that they should take the current measurement of productivity, and then measure again after the solution has been implemented. This benchmarking approach will allow Henry and Fred to see the real effect of the solution on the business need. What term is assigned to this measurement?

A.

Post implementation factor

B.

Yield

C.

Key performance indicators

D.

S-Curve

Full Access
Question # 97

If a requirement has been satisfied, why is it still considered a requirement?

A.

A requirement is considered a requirement as long as the requirement may be able to be changed.

B.

Requirements are considered requirements even if the requirements have been satisfied.

C.

A requirement is considered valid as long as the business stakeholders need it.

D.

If a requirement has been satisfied, it is no longer a requirement and should be purged from the requirements set.

Full Access
Question # 98

Which stakeholder analysis technique shows stakeholders that fall outside the scope of the solution but still interact with it in some way?

A.

Risk analysis

B.

Interview

C.

Scope modeling

D.

Process modeling

Full Access
Question # 99

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Full Access
Question # 100

All of the following are documented approaches to business analysis work except for which one?

A.

Deming's Quality Circle

B.

Six Sigma

C.

Waterfall approach

D.

Lean

Full Access
Question # 101

You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?

A.

Roles and Responsibilities

B.

Stakeholder List

C.

Business Need

D.

Risk Assessment

Full Access
Question # 102

Sam is preparing for the task of prioritizing requirements and he'll need five inputs to accomplish the task. Which one of the following is not an input that Sam will use to prioritize requirements?

A.

Risk analysis

B.

Business need

C.

Requirements management plan

D.

Business case

Full Access
Question # 103

You are the business analyst for a smaller project where there are few requirements. Management would still like you to create a method to trace the few requirements for this project. What type of matrix would be best in this instance?

A.

Coverage matrix

B.

Requirements trace matrix

C.

Roles and responsibility matrix

D.

RACI matrix

Full Access
Question # 104

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Full Access
Question # 105

The Business Requirements Document (BRD) prepared by the business analyst (BA) was circulated to stakeholders for approval. Some stakeholders objected to the Use Case diagrams and could not understand them. Why would these be included in the document?

A.

The models were included as a mistake because Use Case diagrams are technical.

B.

The models are part of the technical documents and not part of BRD documents.

C.

The models are used for analysis and refining requirements and design.

D.

The models did not change the value compared to text-based requirements

Full Access
Question # 106

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

A.

To verify requirements

B.

To measure solution performance

C.

To validate requirements

D.

To compare solution options

Full Access
Question # 107

A business analyst (BA) creates several use case scenarios to specify the requirements for a system. When the beta version of the system is released, there are problems because several important pieces of information are missing. What should the BA have done to avoid this situation?

A.

Performed decision analysis

B.

Identified assumptions

C.

Prepared activity diagrams

D.

Analyzed completeness

Full Access
Question # 108

A business analyst (BA) was asked by the vice president (VP) to evaluate the organization's claims processing capability and recommend improvements. The VP agreed to the BA's recommended solution approach and identified an external vendor to develop the modernized claims processing system. Before contracting with the external vendor, the BA realized that the budget should be approved by the Chief Financial Officer. What was missed by the BA when performing stakeholder analysis?

A.

Attitude

B.

Roles

C.

Decision making authority

D.

Level of influence

Full Access
Question # 109

A senior business analyst (BA) is tasked with verifying a set of requirements written by a junior BA for a

system. During this exercise, the junior BA will ensure that the requirements exhibit atomic characteristics. The senior BA will be verifying that the requirements:

A.

can be understood independently of other requirements.

B.

are written using terminology common for the audience.

C.

contain no extraneous and unnecessary content.

D.

are aligned with the identified need of the stakeholders.

Full Access
Question # 110

Sam is the project manager of the NHT Project. His project has stakeholders from the end users, server administrators, functional managers, external customers, technicians, and executive managers. In this high- profile project, which group of stakeholders is the most important?

A.

End users

B.

External customers

C.

Executive management

D.

No stakeholders are more important than other stakeholders.

Full Access
Question # 111

Bradley is working with the business analyst Marsha to prioritize requirements for their organization. Marsha insists that the requirements be ranked on the cost-benefits analysis of the relative value to the organization. What type of prioritization approach does Marsha want to use in this scenario?

A.

Likelihood of success

B.

Business value

C.

Urgency

D.

CBR Ratio

Full Access
Question # 112

You are the business analyst in your organization. Management comes to you with a customer complaint that they'd like you to analyze. What's the common task associated with customer complaints or loss of revenue?

A.

Stakeholder assessment of implementation

B.

Issue management and identification

C.

Evaluation of a business need

D.

Capability assessment

Full Access
Question # 113

Which solution scope creation technique can be best described as the depiction of the scope of work required to integrate the new solution into the business and technical environments?

A.

Scope modeling

B.

Interface analysis

C.

User stories

D.

Functional decomposition

Full Access
Question # 114

Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?

A.

Requirements envisioning

B.

Project scope

C.

Requirements foundation

D.

Product scope

Full Access
Question # 115

As a business analyst, you should work to identify opportunities to improve the operations of your organization. Which one of the following improvement opportunities aims to improve the experience of the customer?

A.

Eliminate redundancy.

B.

Automate or simplify the work people perform.

C.

Increase consistency of behavior.

D.

Improve the purchasing process.

Full Access
Question # 116

You are the business analyst for your organization and you're working with your manager to discuss the constraints and assumptions that may affect the requirements. Your manager wants to know from where you've derived the list of constraints and assumptions. What's the best answer as to where assumptions and constraints are identified?

A.

Assumptions and constraints are identified through a review of project requirements.

B.

Assumptions and constraints are identified through elicitation from stakeholders.

C.

Assumptions and constraints are identified through risk identification and analysis.

D.

Assumptions and constraints are identified through document analysis.

Full Access
Question # 117

A business analyst has been assigned the task of developing a model of the current state of an organization. The business analyst doesn't understand why a current state may be needed. All of the following are good reasons to create a current state model of an organization except for which one?

A.

Analyzing the current state of the organization to look for opportunities for improvement

B.

Assessing the positive and negative risks that may exist within the current state

C.

Validating the solution scope with businesses and technical stakeholders

D.

Assisting stakeholders to understand the current state

Full Access
Question # 118

Enterprise analysis provides many things for an organization. All of the following are tasks included in enterprise analysis except for which one?

A.

Assess capability gaps

B.

Determine solution approach

C.

Define business need

D.

Solution performance assessment

Full Access
Question # 119

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Full Access
Question # 120

A business analyst (BA) identified that a stakeholder requirement for an online system led to a functional requirement to provide a user login screen. This is an example of which type of traceability relationship?

A.

Validate

B.

Satisfy

C.

Depend

D.

Derive

Full Access
Question # 121

A business analyst (BA) is planning the requirements attributes. The BA received a long list of requirements that must be implemented in different phases. Which requirements attribute can the BA include to allocate the requirements to the proper phase?

A.

Status

B.

Author

C.

Priority

D.

Source

Full Access
Question # 122

In order to plan the business analysis approach, the business analyst must understand the organizational process needs and what other thing?

A.

Operation of organizations and the objectives of business analysis

B.

Consideration of risk and reward

C.

Purpose of the proposed solution

D.

Stakeholders' threats and perceived threats

Full Access
Question # 123

A business analyst (BA) has completed an impact analysis of a proposed change, gained approval for the change, and has updated the requirements. The project sponsor wants to be updated with an overview of the results. How should the BA communicate the results?

A.

Schedule a requirements workshop

B.

Present the requirements at a high-level

C.

Email the requirements package

D.

Create use case scenarios

Full Access
Question # 124

You are the business analyst for your organization and you're training Marcy, a new business analyst, on how requirements are defined. Which one of the following best describes how requirements are defined?

A.

Stakeholders' needs, wants, and expectations

B.

Risk and reward solution

C.

Change-driven approach

D.

Solutions-based approach

Full Access
Question # 125

There are three business analysis planning techniques that a business analyst can use to help plan business analysis processes. Which one of the following is not one of the three techniques?

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Full Access
Question # 126

Marcy is working with stakeholders to understand the stakeholders' needs as part of the business requirements. The stakeholders are describing their needs for new computers for their designers. The stakeholders have specifications, monitors, and software selected for the business requirements. What are the stakeholders actually defining in this scenario?

A.

Solutions

B.

Perceived problems

C.

Perceived needs

D.

Longevity

Full Access
Question # 127

Enterprise analysis creates just five outputs. Which one of the following is an output of the enterprise analysis tasks?

A.

Stakeholder concerns

B.

Solution approach

C.

Solution performance assessment

D.

Assumptions and constraints

Full Access
Question # 128

A business analyst has identified four different solutions for a business need. In the light of solution assessment, how many solution assessment iterations should he do?

A.

The business analyst can do multiple assessments, one for each solution or to compare multiple solutions.

B.

There is no limit, but the business analyst should perform the same type of assessments for each solution to be balanced.

C.

The business analyst can do one assessment per solution.

D.

There should only be one solution assessment - four is too many. Some of the solutions are better than others.

Full Access
Question # 129

An organization has invested $750,000 into a technology to help secure, automate, and communicate customer ordering. The solution has worked well for the past six months, but a newer technology has been developed that surpasses the abilities of the current solution and solves many defects and issues the company has with the existing solution. Purchasing the newer solution, however, means that the company will have to discard the solution that's only been in place for the past six months. What term can be assigned to the monies already implemented into the existing solution?

A.

Opportunity cost

B.

Cost of nonconformance

C.

Sunk costs

D.

Cost-benefits

Full Access
Question # 130

Bonny is the business analyst for her organization and she's making a determination from which vendor the solution should be purchased. She has identified several categories to measure each vendor's overall performance and solution. cost, schedule, experience, certification, references, and years in business. For each category, she has identified scores the vendor may earn; for example, cost is worth 25 points, schedule is worth up to 20 points, and years in business is worth up to ten points. The vendor who gets the most points in the assessment will win the contract. What is Bonny using in this scenario?

A.

Scoring model

B.

Vendor profile assessment scale

C.

Weighted scoring model

D.

Screening system

Full Access
Question # 131

You are the business analyst for your organization. Management has asked that you create a method to store the project requirements including those under development, under review, and the requirements which have been approved. What is management asking you to create?

A.

A change management system

B.

A repository

C.

Requirements register

D.

A project scope statement

Full Access
Question # 132

Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

A.

Get the requirements removed from the project scope.

B.

Change the prioritization of the requirements based on overstated complexity of the project work.

C.

Change the prioritization of the requirements based on the past project.

D.

Have the business analyst report the difficulty of the project work to the project customer.

Full Access
Question # 133

One of the techniques to assess capabilities in an organization is to use SWOT. What does SWOT accomplish?

A.

SWOT reviews your strengths, weaknesses, opportunities, and threats.

B.

It identifies how current capabilities match up against the influencing factors.

C.

It assesses the strength, weaknesses, opportunities, and threats.

D.

SWOT is a goal setting technique that means "Sweat Works Over Time."

Full Access
Question # 134

The business analyst (BA) has traced the requirements for the interaction between a customer and the new online ordering system. Besides enabling the BA to ensure quality of the requirements to stakeholders, tracing the requirements will also enable the BA to:

A.

show all of the decision points in the business process.

B.

illustrate the relationships between relevant requirements.

C.

capture all users that will be impacted by the project.

D.

detail the inner workings of the system being changed.

Full Access
Question # 135

A business analyst (BA) is determining the current state as part of a new project. What is an internal enterprise asset that the BA must include in the analysis?

A.

Brand name

B.

Organizational structure

C.

Business need

D.

Enterprise mission statement

Full Access
Question # 136

A business analyst (BA) was asked to send the requirement details to the project manager (PM), director, vice president (VP), and Chief Information Officer (CIO). The BA shares the complete set of requirements to the PM and director, while creating a summarized version for the VP and CIO. Which aspect of requirement specification and modeling was the BA performing?

A.

Perform stakeholder analysis

B.

Organize requirements categories

C.

Determine approval authority

D.

Implement appropriate level of abstraction

Full Access
Question # 137

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Full Access
Question # 138

Due to a change in regulation, a solution being implemented has a new compliance requirement that must be evaluated. The requirements change strategy focuses on total cost of change as the primary driver for decisions. The business analyst (BA) compiled the following impact assessment of the proposed change based on the new compliance requirement.

What recommendation should the BA make to the stakeholders based on the above information?

A.

Approve the requirement

B.

Request additional information

C.

Defer the requirement

D.

Reject the requirement

Full Access
Question # 139

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Full Access
Question # 140

A business analyst (BA) is planning the traceability approach for a project. Why should the BA conduct this planning activity?

A.

To verify that project information is represented at a high level of abstraction

B.

To document the relationship between the different phases of the project for different stakeholders

C.

To ensure the approach provides enough detail to add value without excessive overhead

D.

To associate information with individual or related groups of requirements

Full Access
Question # 141

A business analyst (BA) needs approval for the requirements which were elicited, collated, and verified by a peer. The BA needs to understand the approval process and appropriatestakeholders who have the authority to approve the requirements. Which of the following artifacts contains this information?

A.

Information management approach

B.

Stakeholder engagement approach

C.

Governance approach

D.

Business analysis approach

Full Access
Question # 142

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Full Access
Question # 143

A business analyst (BA) is conducting a workshop with the purpose of analyzing a business process. Stakeholders of different business units are in attendance. Each stakeholder is able to explain their unit's contribution to the process, however, there is no end to end process owner who can provide a consolidated view. Which technique should the BA use to compare the stakeholder's inputs against each other in order to check for consistency and omissions?

A.

Schedule a follow-up workshop to give more time for additional input

B.

Create a use case scenario that describes the process step by step

C.

Develop a process model with swimlanes to highlight the handoff points

D.

Create a logical data model with the information elicited

Full Access
Question # 144

A business analyst (BA) has documented the components of an information technology (IT) library, in preparation for establishing a consolidated catalogue of IT services. When interviewed, several of the IT managers indicated they already have a catalogue, and have no additional information to provide. What activity is necessary to support the project?

A.

Analyze existing catalogues

B.

Confirm the project objectives

C.

Expand the interview list

D.

Conduct a focus group

Full Access
Question # 145

A business analyst (BA) identifies a design option that enhances the performance of the business by automating repetitive tasks that require multiple staff touchpoints to complete a single task. Which type of improvement opportunity is identified by the BA?

A.

Identify additional capabilities

B.

Increase efficiencies

C.

Reduce costs

D.

Improve access to information

Full Access
Question # 146

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Full Access
Question # 147

A business analyst (BA) is in the process of eliciting requirements. It has been determined that not all requirements can be implemented by the project deadline due to complexity. What must the BA do to ensure maximum benefit for the stakeholders?

A.

Ensure users are trained based on requirements

B.

Apply quality control on requirements

C.

Utilize requirements documentation template

D.

Maintain requirements based on priority

Full Access
Question # 148

A company wants to increase its market share in the industry and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

A.

Redefine the business requirements associated with each implementation

B.

Recommend a reduction in the project scope

C.

Allocate requirements to different releases

D.

Ensure all requirements are traceable using a matrix

Full Access
Question # 149

The business analyst (BA) is analyzing the formal relationships between people working in the enterprise. Which technique will the BA use to perform this task?

A.

Organizational modelling

B.

Stakeholder modelling

C.

Focus groups

D.

Functional decomposition

Full Access
Question # 150

A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?

A.

Such traceability is at a lower level of abstraction for this project

B.

The value each link is delivering in this situation is not high

C.

Traceability is a low priority as the BA has other work to complete

D.

It is impossible for anyone to confirm if such links are correct

Full Access
Question # 151

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Full Access
Question # 152

A large online retailer is introducing new technology to upgrade its aging ordering process. The business analyst (BA) has drawn a stakeholder matrix showing information on how to engage with the stakeholders throughout the project.

Using the stakeholder matrix as a guide, how should the BA engage the suppliers?

A.

Meet with the suppliers to discuss their needs

B.

Ensure the suppliers are kept informed by showing interest in their needs

C.

Communicate changes to the suppliers by general communication

D.

Focus efforts to engage with the suppliers regularly

Full Access
Question # 153

A business analyst (BA) is verifying requirements for a software solution. The BA needs to confirm that items determined to be important are included in the final requirements deliverable. Which of the following will help the BA complete this task?

A.

Checklists

B.

Requirements matrix

C.

Evaluation criteria

D.

Prioritization

Full Access
Question # 154

A business analyst (BA) is working on a project involving the purchase of a commercial off-the-shelf (COTS) product. All internal risks have been identified and assessed. What is the BA's next course of action?

A.

Review the business objectives

B.

Consult the business case

C.

Assess external risks

D.

Perform an environmental scan

Full Access
Question # 155

A business analyst (BA) has identified the impacts and resolution for a proposed change. Based on the Responsible, Accountable, Consulted, informed (RACI) matrix, who must approve the change before it is implemented?

A.

Subject matter expert

B.

Business sponsor

C.

Project manager

D.

System architect

Full Access
Question # 156

Several user groups are impacted by a proposed change to their daily work flow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

A.

Develop a data model diagram

B.

Create business process models

C.

Write functional requirements

D.

Establish a communication plan

Full Access
Question # 157

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Full Access
Question # 158

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Full Access
Question # 159

A business analyst (BA) is reviewing the elicitation results of several workshops in order to decide which technique to use to model the requirements. The elicitation identified user roles needed in a future solution, the functionality needed by each of these roles, and how the desired interaction with the solution should look.

Which technique allows the BA to model this type of information?

A.

Process models

B.

Roles and permission matrix

C.

Use cases and scenarios

D.

Sequence diagrams

Full Access
Question # 160

A new regulation is introduced that the project must comply with to remain competitive and industry compliant. Management wants to understand the effect of this new requirement on the project. What will the business analyst (BA) use to evaluate the change?

A.

Process Modelling

B.

Domain Knowledge

C.

Traceability

D.

Impact Analysis

Full Access
Question # 161

A company is embarking on a software project in a heavily regulated domain. The client expects large upfront planning and detailed documentation for the project. The recommended approach for the project will be:

A.

adaptive.

B.

predictive.

C.

waterfall.

D.

scrum.

Full Access
Question # 162

A business analyst (BA) is informing stakeholders about the importance of quality when eliciting requirements. What characteristic describes a quality requirement?

A.

Simplistic

B.

Consistent

C.

Critical

D.

Functional

Full Access
Question # 163

You are the business analyst for your organization and you're notifying the key stakeholders of a need to gather requirements for an endeavor. One of the stakeholders that you'll need to attend your requirements workshop is the project manager. What role will the project manager have in this workshop?

A.

The project manager will facilitate the requirements workshop.

B.

The project manager will ensure that the needed resources are available.

C.

None, the project manager should not be involved until all of the requirements have been identified.

D.

The project manager will help elicit requirements from the stakeholders.

Full Access
Question # 164

Which task in the requirements analysis knowledge area is best described as ensuring that the requirements specifications and models meet the necessary standard of quality to allow them to be used effectively to guide further work?

A.

Defining assumptions and constraints

B.

Organizing requirements

C.

Specifying and modeling requirements

D.

Requirements verification

Full Access
Question # 165

Management in your organization wants you to create a graphical model to show the business logic of the requirements. What other term are graphical models known as?

A.

Flowcharts

B.

Mind maps

C.

Influence diagram

D.

Diagrams

Full Access
Question # 166

A business analyst needs to prepare the requirements package for her endeavor in a predefined template for her company. What term can be assigned to this standardized template for packaging the requirements?

A.

Organizational process assets

B.

Derivative adaption

C.

Essential

D.

Enterprise environmental factors

Full Access
Question # 167

You are the business analyst for your organization and you're preparing the solution for your organization's review and implementation. Some of the requirements of the solution, however, must be inspected by compliance officers before the project and implementation can move forward. The requirements of the inspection can be best described as what?

A.

Bottleneck

B.

Requirements

C.

Cost-negativity

D.

Constraint

Full Access
Question # 168

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year. What does the $300,000 represent?

A.

Budget

B.

Constraint

C.

Solution cost

D.

Requirements

Full Access
Question # 169

Barry is a project stakeholder that is excited about the deliverable your project wants to create for the organization. He's helpful, provides information, and offers support whenever your project needs it. How would you classify Barry based on this information?

A.

Positive stakeholder

B.

Cheerleader

C.

Project sponsor

D.

Project team member

Full Access
Question # 170

What should an organization do if the business analyst has determined that the existing capabilities are inadequate to seize an opportunity?

A.

Recommend that the organization launch a project to create the capabilities needed.

B.

Recommend that the organization not pursue the opportunity.

C.

Recommend that the organization hire contractors with the needed capabilities.

D.

Recommend that the organization share the opportunity with other organizations.

Full Access
Question # 171

In order to have high quality in requirements, all of the following characteristics should exist in the requirements except for which one?

A.

Cohesive

B.

Consistent

C.

Complete

D.

Constrained

Full Access
Question # 172

Complete this statement.are longer-term, ongoing, and qualitative statements of a state or condition that the organization is seeking to establish and maintain.

A.

Objectives

B.

Goals

C.

Requirements

D.

Operations

Full Access
Question # 173

In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

A.

Business analysis approach

B.

Stakeholder tolerance for risk

C.

Stakeholder list, roles, and responsibilities

D.

Business analysis performance assessment

Full Access
Question # 174

A business analyst is meeting with the customer of the project. The customer tells the business analyst that she can only allow the budget of $575,000 for the project. This budget is best described as what type of constraint?

A.

Technical constraint

B.

Verified constraint

C.

Financial constraint

D.

Business constraint

Full Access
Question # 175

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders located in offices around the world. Because these stakeholders are dispersed, what is likely to increase in this endeavor as opposed to a collocated group of stakeholders?

A.

Costs

B.

Face-to-face meetings

C.

Communication needs

D.

Risks

Full Access
Question # 176

There are four inputs to the plan business analysis activities. Which one of the following is not an input to the plan business analysis activities process?

A.

Stakeholder list, roles, and responsibilities

B.

Organizational process assets

C.

Business analysis approach

D.

List of identified risks

Full Access
Question # 177

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Full Access
Question # 178

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following is an elicitation process that is a part of job observation?

A.

Identifying stakeholders

B.

Job shadowing

C.

Defining and determining business analysis processes

D.

Planning how requirements will be approached, traced, and prioritized

Full Access
Question # 179

You are the business analyst for an organization and you're managing your stakeholders through the requirements validation activities. Your stakeholders are categorized by executives, functional managers, directors, end users, and customers. Which of these stakeholders are involved in the requirements validation

activities?

A.

All of the stakeholders

B.

Functional management

C.

Executives

D.

Customers

Full Access
Question # 180

What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?

A.

Activity list

B.

Business analysis plan

C.

Network diagram

D.

Project management plan

Full Access
Question # 181

A business analyst wants to use benchmarking, but the project manager recommends against the approach. There are, as the project manager points out, several disadvantages to benchmarking. Which one of the following is not a disadvantage to benchmarking?

A.

Discovery of new approaches

B.

Time consumption

C.

Requirement of expertise of the person conducting the study

D.

Inability to produce innovative solutions

Full Access
Question # 182

Which of the following defines all of the required work to satisfy the requirements of the project?

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Full Access
Question # 183

The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?

A.

The business need defines the problem the business analyst is finding a solution for.

B.

The business need defines the solution for the business problem.

C.

The business need takes the longest time and costs most of the business analysis efforts.

D.

The definition of the business need determines future solutions, stakeholders, and approaches.

Full Access
Question # 184

Which of the following approaches describes the project management approach of refining requirements and project scope?

A.

Plan-driven

B.

Change-driven

C.

Iterative

D.

Progressive elaboration

Full Access
Question # 185

According to the book 'A Guide to the Business Analysis Body of Knowledge', effective business analysis practices can do what to the amount of change to requirements in a stable business environment?

A.

Reduce the amount of change, but not eliminate entirely.

B.

Document the changes to requirements.

C.

Control the frequency of the change.

D.

Eliminate the change entirely.

Full Access
Question # 186

When a business analyst is using alternative generation, what should she always include as an output?

A.

The cost of all requirements, some requirements, and a few core requirements

B.

The schedule of implementation for each solution

C.

The option of doing nothing

D.

The cost of each solution

Full Access
Question # 187

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Describe a situation or problem

C.

Write in the active voice

D.

Express only one requirement at a time

Full Access
Question # 188

You work as a project manager for SoftTech Inc. You are working with the project stakeholders to begin the qualitative risk analysis process. You will need all of the following as inputs to the qualitative risk analysis process except for which one?

A.

Risk management plan

B.

Stakeholder register

C.

Project scope statement

D.

Risk register

Full Access
Question # 189

A business analyst (BA) is verifying a set of requirements. One of the requirements is “After the customer has received an email confirmation, the customer is likely to access the order status in the order history which is available upon order submission.” Which one of the following requirements quality characteristic is breached?

A.

Concise

B.

Prioritized

C.

Atomic

D.

Understandable

Full Access
Question # 190

By which of the following is the performance of all requirements management and communication activities governed?

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Full Access
Question # 191

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Full Access