Question # 6

TiEr2 data center redundancy is ().

A.

redundancy

B.

fault tolerance

C.

Online maintenance

D.

essential

Full Access
Question # 7

Optical network evaluation optimization service is the main service of transmission professional services, as long as it includes three major service products: WDM network evaluation optimization, SDH network evaluation optimization, and microwave network evaluation optimization.

A.

True

B.

False

Full Access
Question # 8

The main criterion of the data center design reference in the national standard Yes?

A.

GB50174-2008

B.

GB50462-2008

C.

GB50052-2009

D.

GB50352-2005

Full Access
Question # 9

Huawei Data Center L1 Procurement Platform Advantages (Multiple Choice)

A.

Strict production to buy platform

B.

Quality service providers

C.

Flexible local buying platform

D.

Supply of self-developed equipment

Full Access
Question # 10

Which type of disaster recovery plan does not include?

A.

Dual-active solution

B.

High availability scheme based on local display layer

C.

Storage virtualization of the mirroring scheme

D.

Synchronous replication scenario for disk display

Full Access
Question # 11

Electronic information equipment shall be powered by ().

A.

UPS

B.

Electricity

C.

Switching power supply

Full Access
Question # 12

data center L1 integration project main customer type (multiple choice)

A.

Government customers

B.

Internet customers

C.

Large enterprise customers

D.

Traffic customers

Full Access
Question # 13

IP network evaluation optimization service can be sold in scenarios that include friendly equipment.

A.

True

B.

False

Full Access
Question # 14

The currently released Hi-Care maintenance service package does not involve any of the following field service levels.

A.

7x10xND

B.

5x10x4

C.

7x24xND

D.

7x24x4

Full Access
Question # 15

Which products below gold + maintenance services contain inspection services () (multiple choices)

A.

NE Router

B.

CE switch

C.

Transmission, access

D.

storage

E.

server

F.

Wireless & Core

Full Access
Question # 16

Data center L1 layer business deepening design goal (multiple choice)

A.

On the basis of the summary audit plan (bidding plan), the needs of the owner are further clarified, and the boQ at the design plan level is refined, and the design depth reaches the construction drawing standard

B.

Improve the design interface interface to ensure that the design of the respective systems of the project is consistent and coordinated with the professional design of architecture, structure, water, electricity, HVAC, decoration and other professions

C.

Provide technical basis for the bidding of installation units (subcontracted construction units), equipment suppliers and project acceptance

D.

Combined with the actual situation of the project, the work responsibility interface of Huawei (including tripartite purchased parts), subcontractors, and customers is determined, and the project purpose SOW (scope of work) and support determination RM (Responsibility)

Full Access
Question # 17

If the HCIE laboratory examination is not passed for the make-up examination, how many days will be required to take the re-examination?

A.

15

B.

30

C.

60

D.

90

Full Access
Question # 18

Cloud computing data center fast housing exhibition is a strategic opportunity for ITO, this is because: () (multiple choice)

A.

The reconfiguration of the cloud data center operation and maintenance model and the new requirements of the operation and maintenance tools

B.

Asset-light operational requirements and centralized operational risks

C.

Make heavy use of new technologies with data centers

D.

Cloud computing technology teams are hard to come by quickly

Full Access
Question # 19

Huawei Data Center L1 Integration Project Implementation Quality Management Features (Multiple Choice)

A.

Professionalization of construction personnel

B.

Standard job implementation procedures

C.

Support platforms help with implementation quality

D.

High standards for complex engineering

Full Access
Question # 20

What are the following steps in the basic process of FusionSphErE service migration? (Multiple choice)

A.

Migration scenario design

B.

Migration implementation

C.

Migration acceptance

D.

Data backup

Full Access
Question # 21

What are the three typical scenarios of FusionCuBE? (Multiple choice)

A.

Virtual pooling (virtualized appliances).

B.

Database acceleration (all-in-one, HANA all-in-one).

C.

Office cloudification (desktop cloud all-in-one).

D.

Storage resource pooling

Full Access
Question # 22

the architecture of common data backup has (multiple choice)

A.

Data backup architecture based on SOFtwArE-BAsE

B.

Lan-BAsE-based data backup architecture

C.

LAN_FrEE-based data backup schema

D.

Data backup architecture based on SErvER-FrEE

Full Access
Question # 23

In the Hi-Care standard service package provided by Huawei, the spare parts response SLA is.

A.

7x10xND

B.

5x10x4

C.

7x24xND

D.

7x24x4

Full Access
Question # 24

What are the tools that underpin the SmartNOS service?

A.

Service-turbo

B.

Ensp

C.

Packet tracer

D.

Smartkit

Full Access
Question # 25

Which of the following is not a training and certification tool or platform provided by Huawei?

A.

Device emulator

B.

Virtual classroom

C.

Ilearning

D.

Online certification management

Full Access
Question # 26

It is forbidden to undertake to provide more than () services for self-produced equipment.

A.

12 months

B.

6 months

C.

36 months

D.

Other product life cycles

Full Access
Question # 27

ITO services, refers to enterprises focus on their core business, and its IT systems in the form of long-term contracts (3-5 years or even longer) in full or part outsourcing to professional information technology services companies.

A.

True

B.

False

Full Access
Question # 28

What about the wrong description of the Fusionlnsight MPPDB database?

A.

Can handle petabytes and large-scale data

B.

Extremely scalable, can manage hundreds of nodes

C.

does not support sql specifications

D.

Support for multiple database systems

Full Access
Question # 29

The investment model of the cloud IDC project government is as follows. (Multiple choice)

A.

Fiscal allocation model

B.

BT mode

C.

Crowdfunding mode

Full Access
Question # 30

What service offerings are not included in the Customer Support Service in the UniSTAR SCT Configurator? (Multiple choice)

A.

Software Premium Support Services

B.

Video Conferencing Assurance Service

C.

Media retention

D.

On-site service

E.

Device health check

F.

AntiDDoS Remote Emergency Response Service

Full Access
Question # 31

What is not a data center L1 integration service product?

A.

Data Center Infrastructure Design Services

B.

Data Center Infrastructure Optimization Services

C.

Data Center Infrastructure Implementation Services

Full Access
Question # 32

The engineer's on-site service must be purchased on the basis of warranty or maintenance service including on-site service; and its service period must be consistent with the corresponding warranty or maintenance service period, usually sold annually.

A.

True

B.

False

Full Access
Question # 33

The industry customer network environment is complex, the business is not the same, the demand for training courses is not the same, in the case of standardized courses do not meet customer needs, Huawei training and certification services can provide customized training for customers to confirm delivery?

A.

Customized training proposals

B.

Equipment BOQ and quotation

C.

Standard Course Training Proposal

D.

Bid and customer needs list

Full Access
Question # 34

The construction cycle of the emergency integration mode is shortened by 20%, and the TCO is reduced by 10%.

A.

True

B.

False

Full Access
Question # 35

For Huawei's network evaluation and optimization service process, which of the following is the correct service process?

A.

Live network data collection--- live network configuration restoration--- target network design --- implementation plan development--- optimization operation implementation --- acceptance test

B.

Target network design --- live network data collection --- live network configuration restore--- implementation plan development--- optimization operation implementation --- acceptance test

C.

The design of the target network network --- the data collection --- the live network is --- the development of the implementation scheme --- the implementation of the live network configuration restoration --- the optimization of the operation Acceptance testing try

D.

Live network data collection--- live network configuration and restoration --- implementation plan development--- target network design --- optimized operation implementation Acceptance testing try

Full Access
Question # 36

What are the advantages of remote O&M management compared with traditional O&M? (Multiple choice)

A.

Real-time monitoring, automatic protection

B.

Centralized O&M, reducing manpower investment

C.

Cloud fault experience library

D.

Network operations rely on field engineers

E.

NOC expert consultation, more efficient processing efficiency

Full Access
Question # 37

Huawei's enterprise product technology training takes the service life cycle as the design bus, and there are corresponding courses to meet the learning needs of students in three stages: planning, design, implementation, and operation.

A.

True

B.

False

Full Access
Question # 38

What methods does UniSTAR SCT Configurator support for maintenance service quotation? (Multiple choice)

A.

and equipment mixed quotes

B.

Generated by a device quote

C.

Create service quotes separately

D.

Manual insertion

E.

Configurator manual quote summary

Full Access
Question # 39

Data Center L1 Layer Business Preparation Phase Objective () (Multiple Choice)

A.

Clarify existing contract interfaces and output services

B.

Subcontract Key Point Tips

C.

Prepare construction resources and environment

D.

Develop a reasonable and efficient construction plan

E.

Do a good job in technical communication and training before construction

Full Access