The proposal consists of.
- 3 HPE Synergy 12000 frames
- 6 HPE Composer 2 modules
- 2 HPE Virtual Connect SE 100 GO F32 Module
- 4 HPE Synergy 50 GO interconnect Link Module
Which statements about this proposed design are true? (Select two.)
Your customer wants to add multiple compute nodes to an existing HPE SimpliVity environment.
Which statement about this expansion is true?
Your customer plans to manage HPE Primera using HPE Oneview
Which storage management tasks can be completed using HPE OneView for this environment?
Click the option that will allow you to create an OS Deployment Plan with customized kickstart.
A junior architect designed a solution based on HPE Synergy that must meet the following requirements:
Support at least 30 HPE Synergy 480 Gen10 Plus compute modules
Interconnect modules must provide MAC and WWN virtualization
All HPE Synergy frames must formulate a single management entity
The management appliance should not be a single point of failure
Connectivity to FC array should be available to all compute nodesThe proposal consists of:
3 HPE Synergy 12000 frames
6 HPE Composer 2 modules
2 HPE Virtual Connect SE 100Gb F32 Module
4 HPE Synergy 50Gb Interconnect Link ModuleWhich statements about this proposed design are true? (Select two)
Your customer is trying to grow a VMware cluster using HPE OneView for VMware vCenter Server. They get an error and cannot proceed.
Which tool should you use to troubleshoot the problem?
Your customer has a logical enclosure configured using a angle HPE Synergy frame with the following configuration
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- two HPE Synergy Virtual Connect SE 32Gb FC Modules -12 HPE Synergy 480 Gen10 Plus compute nodes with appropriate mezzanine cards
They plan to add a new HPE Synergy frame to an existing logical enclosure with the following configuration
- two HPE Synergy Virtual Connect SE 32Gb FC Modules
- two HPE Synergy 20Gb interconnect Link Modules
- Eight HPE Synergy 480 Gen 10 Plus compute nodes with appropriate mezzanine cards
Which statement about the planned configuration change is true?
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives
The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options
Which statement about this request is true?
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?
As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2
Why would you recommend this change?
Your customer has an HPE Synergy frame equipped with a D3940 Storage Module. Each of the compute nodes has an appropriate storage controller Installed and two 12Gb SAS switches installed in the first fabric.
The customer reports that compute nodes cannot access the storage module. What should you verify first when troubleshooting this problem?
Your customer wants to compare HPE Superdome Flex with HPE Superdome Flex 280.
Which statement about these two systems is true?
Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.
Your customer plans to deploy VMware vSAN using D3940 Storage Modules.
Which statement about this solution is true?
Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.
Your customer with an HPE Synergy environment needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Which parameter can the customer configure within an uplink set to meet their requirements?
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.
Your customer plans to deploy VMware ESXi 7. 0 U2, and they are looking for a hardware platform that will allow them to use up to 16 CPU sockets
Which HPE compute system meets the customer requirements?
Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?