Question # 6

Which item causes the MOST issues when planning for systems workstations in an office space?

A.

The workstation cost is too expensive for the client’s budget

B.

The thickness of the panels was not considered when maintaining clearances

C.

The height of the panels is too low to reduce sound from traveling between workstations

D.

The electrical outlets are not maintained at the correct height to accommodate equipment

Full Access
Question # 7

Permit application requirements are developed by the

A.

local jurisdiction of the project

B.

International Code Council (ICC)

C.

general contractor for the project

D.

National Fire Protection Association (NFPA)

Full Access
Question # 8

During a substantial completion walk-through, a designer notices that a door was installed incorrectly. What should the designer do NEXT?

A.

Meet with the general contractor, review the drawings, and schedule replacement

B.

Process a change order and include the new door location

C.

Add the door location and problem to the punch (deficiency) list

D.

Ask the client to accept the door, with a credit memo

Full Access
Question # 9

What is the BEST way for a designer to determine whether the payment application of a contractor is consistent with the work completed to date?

A.

Request a breakdown of the pricing in the payment application to be reviewed by the consultants

B.

Participate in periodic site visits to compare progress onsite to progress claimed in the payment application

C.

Review the project schedule to determine what should be completed by the date of the payment application

D.

Call the subcontractors individually to verify that the work noted on the payment application is indeed complete

Full Access
Question # 10

In addition to the use of carpet on the floor, which of the following methods is the BEST solution to address the need for acoustical privacy in a conference room?

A.

Specify interior partitions to the underside of the deck above, add fiberglass insulation to partitions

B.

Specify an acoustical ceiling tile, insulate and caulk joints between partition and ceiling and at electrical receptacles

C.

Specify interior partitions to 6" [152 mm] above an acoustical ceiling, specify batt insulation over the top, 24" [610 mm] each side

D.

Specify metal stud partitions to the underside of the deck above, 5/8" [16 mm] fire-rated gypsum board covered with Type II vinyl wallcovering

Full Access
Question # 11

Which wall assembly would produce the highest STC rating?

A.

2x4 studs at 16" [406 mm] OC, 2 layers of 5/8" [15 mm] gypsum board on each side, full batt insulation

B.

2-1/2" [64 mm] metal studs at 16" [406 mm] OC, 1/2" [13 mm] gypsum board on each side, full batt insulation

C.

3-1/2" [89 mm] metal studs at 16" [406 mm] OC, 5/8" [15 mm] gypsum board on each side, full batt insulation

Full Access
Question # 12

A contractor defaults on payments to a mechanical subcontractor. The subcontractor is protected and guaranteed payment by a

A.

payment bond

B.

mechanic’s lien

C.

performance bond

D.

builder’s risk insurance

Full Access
Question # 13

Which scheduling method BEST shows the interrelationships of tasks?

A.

work plan

B.

Gantt chart

C.

critical path

D.

milestone chart

Full Access
Question # 14

Which consultant should be contacted to correct omissions on the drawing shown below?

A.

Electrical

B.

Plumbing

C.

Structural

D.

Fire protection

Full Access
Question # 15

Plumbing traps are an essential feature of sanitary drains because they prevent

A.

the backflow of wastewater

B.

the backflow of sewer gases

C.

the contamination of water supply with wastewater

D.

the contamination of water supply with sewer gases

Full Access
Question # 16

What provision should a designer include in the contract to minimize liability in claims that arise from delays caused by other project members?

A.

An exclusion of liability for delays caused by other project members

B.

A realistic project schedule with deadlines for each phase of the project

C.

A specified number of months the contract is in force, with a renewal clause

D.

Language excluding the designer from delay-related errors and omissions liability

Full Access
Question # 17

Legislation that establishes guidelines of professional responsibilities for an interior designer is known as the

A.

title act

B.

practice act

C.

registration act

D.

professional act

Full Access
Question # 18

While on site, the designer notices that the glazing subcontractor is installing the storefront system in the wrong finish. What should the designer do?

A.

Report the discrepancy in a memo to the contractor and client

B.

Reach out to the glazing supplier to find out which finish was ordered

C.

Explain the issue at the next owner, architect, contractor (OAC) meeting

D.

Tell the subcontractor to stop their work and explain the issue to the contractor

Full Access
Question # 19

In new construction, when would be the appropriate time to schedule an on-site review of wall blocking for an artwork package?

A.

when the artwork arrives on site

B.

before gypsum board is installed

C.

during a preconstruction meeting

D.

before electrical systems are installed

Full Access
Question # 20

A project is utilizing existing millwork with new custom countertops. Who is responsible to field verify the existing conditions to generate shop drawings for the new countertops?

A.

owner

B.

installer

C.

designer

Full Access
Question # 21

A lien has been placed on a building. What may be a probable cause for this action?

A.

A subcontractor has not been paid by the general contractor

B.

The certificate of substantial completion has not been issued

C.

The client requires more financing

D.

Contract documents do not comply with building code

Full Access
Question # 22

What floor finish would BEST support a passive solar design strategy in a hot arid climate?

A.

vinyl

B.

wood

C.

carpet

D.

concrete

Full Access
Question # 23

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Full Access
Question # 24

Changes made to the contract documents during the bid (tender) process are documented in a(n)

A.

Bulletin

B.

Addendum

C.

Change order

Full Access
Question # 25

In order for a building permit to be issued, what MUST be completed?

A.

demolition phase of project

B.

submission of contract documents

C.

final inspection by a building official

D.

issuance of the certificate of occupancy

Full Access
Question # 26

A project is considered substantial and complete when

A.

Partial occupancy has been issued

B.

Deficiencies have been documented

C.

Progress payments have been administered

D.

The owner can use it for its intended purpose

Full Access
Question # 27

Which type of mechanical heating system uses pipes or tubing embedded within the ceiling, floor, or wall construction?

A.

electric

B.

radiant

C.

hot-water

D.

forced-air

Full Access
Question # 28

Information regarding product substitutions is found in the

A.

bid (tender) forms

B.

general requirements

C.

material specifications

Full Access
Question # 29

A client wants to remove the gypsum board from an existing structural column and leave it exposed. What implications might this have on the fire rating of the assembly?

A.

Reduce the fire rating of the assembly

B.

Increase the fire rating of the assembly

C.

There would be no change in the fire rating of the assembly

Full Access
Question # 30

Which of the following should be installed at regular intervals to avoid cracking of a GWB ceiling from building structural movement?

A.

J mold

B.

U channel

C.

Control joint

D.

Elastic sealant

Full Access
Question # 31

A contractor has notified the designer that the existing paint in a space tests positive for lead. What is the correct course of action?

A.

The lead paint should be encapsulated with oil-based paint

B.

The designer should notify the Environmental Protection Agency (EPA)

C.

A professional licensed contractor should perform lead-paint abatement

D.

A custodian should vacuum with a high-efficiency particulate air (HEPA) filter vacuum

Full Access
Question # 32

A project is running behind schedule and over budget. What should the designer do FIRST?

A.

Review and determine budget cuts with the client

B.

Simplify installation methods to save both cost and time

C.

Contact the client to discuss the problem as soon as possible

D.

Rank construction priorities and complete the critical path elements first

Full Access
Question # 33

An interior designer was contacted by their client shortly after occupancy and move-in, complaining that lights in private offices and some spaces were turning off automatically after a few minutes. What is the BEST next step?

A.

Inform the client that they can disconnect the occupancy sensors

B.

Reconfigure the spaces with issues to better improve occupancy sensor line-of-sight

C.

Have the occupancy sensors replaced with manual switches at the owner’s expense

D.

Contact the installer to check that the occupancy sensors are set to the maximum time limit

Full Access
Question # 34

A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?

A.

Reception sofa

B.

Break room barstools

C.

Open office workstations

Full Access
Question # 35

When developing a design, which BEST unifies the project and provides specific direction for the design?

A.

Feasibility studies

B.

Concept statement

C.

Space allocation studies

D.

Programming and research

Full Access
Question # 36

What are the three parts of a Construction Specification Institute (CSI) specification?

A.

general, products, execution

B.

allowance, alternate, application

C.

information, purchasing, installing

D.

requirements, finishes, construction

Full Access
Question # 37

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis

Full Access
Question # 38

What method of payment for interior design services poses the least financial risk to the designer?

A.

time-based fee

B.

fixed design fee

C.

value-based fee

D.

retail sales-based fee

Full Access
Question # 39

In an existing non-sprinklered multi-tenant building, a client will be converting a suite from a bank into a restaurant serving more than 49 persons. What fire rating is REQUIRED between the new tenant and the existing adjacent insurance office?

A.

0

B.

1

C.

2

D.

3

Full Access
Question # 40

On a small project with an unclear scope involving multiple stakeholders, which fee method would be BEST utilized by the designer?

A.

hourly

B.

fixed-fee

C.

cost-plus

D.

square footage

Full Access
Question # 41

The purpose of a post-occupancy evaluation is to determine

A.

Compliance with the punch (deficiency) list

B.

The quality of general contractor performance

C.

The completeness of the construction documents

D.

Client satisfaction or dissatisfaction with the project

Full Access
Question # 42

Which of the following is MOST likely to require a louvered door?

A.

IT closet

B.

Hotel room

C.

Executive office

D.

Dental exam room

Full Access
Question # 43

Which specification will offer interior designers the most control of the furniture system over the project?

A.

reference

B.

descriptive

C.

proprietary

D.

performance

Full Access
Question # 44

Which elements are MOST important when preparing resilient sheet flooring estimates?

A.

Seaming diagram, roll width, and door thresholds

B.

Roll width, room dimensions, and seaming diagram

C.

Room dimensions, roll width, and location of columns

D.

Door thresholds, room dimensions, and location of columns

Full Access
Question # 45

Which of the following is part of an active system for fire protection?

A.

Area of refuge

B.

Means of egress

C.

Protected stairwells

D.

Pre-action sprinklers

Full Access
Question # 46

What spaces are typically grouped together in a multistory building’s service core?

A.

lobby, elevator, corridors, stairs

B.

stairs, elevator, toilet rooms, supply closet

C.

kitchen, toilet rooms, loading docks, laundry

D.

janitors closets, electrical closets, data rooms, HVAC

Full Access
Question # 47

During early planning stages of a sustainable project, which of the following elements are the MOST important to develop?

A.

LED lighting and locally sourced materials

B.

Wind power and recycled content materials

C.

Composting toilets and renewable power sources

Full Access
Question # 48

After completion of a project, the client spills coffee on their new lobby sofa. Where would the client look for information on how to remove the stain?

A.

product data sheet

B.

warranty information

C.

maintenance manual

D.

furniture specification

Full Access
Question # 49

The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

A.

mutual assent

B.

breach of contract

C.

contractual capacity

D.

designer responsible disclaimer

Full Access
Question # 50

A client wants to convert a 10,000 sf [929 m²] retail facility into an office space. What is the MOST important activity to do as a part of programming?

A.

Identify building codes

B.

Prepare record (as-built) drawings

C.

Calculate the number of parking spaces

D.

Determine which consultants are required

Full Access
Question # 51

While visiting a job site, it is observed that the junction boxes for wall sconces are mounted at thewrong height. What should be done?

A.

Tell the electrical contractor on-site to move them and follow up with written documentation

B.

Issue a proposal request to the general contractor to verify the cost for having them relocated

C.

Notify the general contractor’s superintendent on-site and follow up with written documentation

D.

Wait until construction has been completed and then note the problem on the punch (deficiency) list

Full Access
Question # 52

What is the required clear floor space at an accessible lavatory in a public restroom (washroom)?

A.

24" x 42" [610 mm x 1067 mm]

B.

24" x 48" [610 mm x 1219 mm]

C.

30" x 36" [762 mm x 914 mm]

D.

30" x 48" [762 mm x 1219 mm]

Full Access